|
Central-Heating Installation Work – Sv-Msi-261119-008 - Prs: New Concept For Sauna, Heat Supply Systems. New Concept For The Sauna In The Prinzregetenstadion In Munich: The Heat Supply Systems Will Be Renewed Or Adapted To The New Use. The Services Include Dismantling Work As Well As The Construction Or Adaptation Of Heat Generation And Distribution With Brine/Water Heat Pump Cascade, Buffer Storage, Heat Exchangers, Pumps, Fittings, Pipes, Underfloor Heating And Electric Heating Surfaces. In Addition, There Are Safety Equipment, Thermal Insulation And Fire Protection Work, Winter Building Heating As Well As Testing, Commissioning, Trial Operation, Documentation And Operator Training. The Execution Takes Place In The Existing Building While The Adjacent Areas Are In Operation. Essential Quantitative Information Dismantling: Approx. 30 M Steel Pipe Dn 15-50, 4 Fittings, 4 Measuring/Sensor Devices Heat Generation: 1; Heat Pump Cascade With 2 Heat Pumps, Buffer Tank 2,000/1,000 L, 3 Heat Exchangers, 2; Electric Heating Register Of 12 Kw Each Safety Technology: 11 Safety Valves, 5 Pressure Expansion Vessels, Make-Up, 2 Filling Water Treatments, 2 Sludge Separators, 2 Air Vents Pumps/Fittings: 9 Circulation Pumps, 1 Heating Distributor, Approx. 100 Fittings, Approx. 100 Measuring/Accessory Parts; Insulation/Fire Protection: Approx. 970 M Of Pipe Insulation, 50 Fire Protection Partitions; Piping: Approx. 215 M Steel Pipe, 790 M Stainless Steel Press Pipe Surface Heating: Approx. 1,050 Sqm, 10,500 M Pe-Xc Heating Pipe, 7 Heating Circuit Distributors, 8 Distribution Cabinets; Additional Services: 30 Core Drillings, 14 M Slots, Approx. 55 M Mounting Rails; Winter Building Heating: 5 Air Heaters Of 20 Kw Each, Approx. 240 M Of Heating Cables; Other: Work/Assembly Planning, Hydraulic Balancing, Tests, Documentation, Commissioning And Instruction.;
|