1. The Subject Of The Contract Is The Construction Of A Road Connection From Gorzelniana Street To Jesionowa Street In Dębina As Part Of The Multi-Annual Program Called Government Program To Increase The Development Opportunities Of The Słupsk Land For The Years 2019-2027. 2. Description Of The Subject Of The Order: Material Scope Of The Investment: 1. Roadconstruction Of The Road And Exits8 Cm - Vibro-Pressed Concrete Cubes, Gray Or Graphite (Exit)4 Cm - Technological Cement-Sand Ballast20 Cm - Subbase Of Crushed Aggregate With Continuous Grain, Mechanically Stabilized C90/3 (Broken 0/31.5 Mm)30 Cm - C3/4 Soil Cement From Delivered Structure Roadways And Exits - Low-Load-Bearing Soils, 8 Cm - Vibro-Pressed Concrete Cubes, 4 Cm - Technological Cement And Sand Backfill, 20 Cm - Foundation Of Crushed Aggregate With Mechanically Stabilized Continuous Grain C90/3 Placed On A Geogrid, 60 Cm - Expanded Clay Mattress Wrapped In Geotextile - Min. 25Kn/Mpavement Structure8 Cm - Vibro-Pressed Concrete Cubes, Yellow4 Cm - Technological Cement-Sand Ballast15 Cm - Subbase Of Broken Aggregate With Continuous Grain, Mechanically Stabilized C90/3 (Broken 0/31.5 Mm)Lawn Structure10 Cm - Layer Of A Mixture Of Fertile Soil And Peatsection Length Covered By The Application - Approx. 1,870 Mb Road - Single-Lane, Two-Way (Road 4.5 M - 5.0 M) Number Of Lanes - 2, One In Each Direction The Entire Investment Task Includes: 9,542 M² - Roadway Made Of Concrete Cubes 69 M² - Sidewalk Made Of Concrete Cubes 452 M² - Exits Made Of Concrete Cubes 7,731 M² - Biologically Active Area2. Road Lightinglighting Poles H = 8 M With A 1M Boom – 34 Pcs. Led Luminaires – 34 Pcs. 3. Technological Channel) Construction Of A Street Technological Channel Ktu From 3 Rhdpe Pipes Ø 40/3.7 Mm And 1 Rhdpe Pipe Ø 110 Mm - 2119.0 M, B) Construction Of A Culvert Technological Channel Ktp From 2 Rhdpe Pipes Ø 140 Mm And 3 Rhdpe Pipes Ø 40/3.7 Mm - 398.0 M, C) Construction Of A Well Cable Skr-1 - 56 Sets D) Securing The Orange Sewage System With A Two-Piece Arot Pipe Ø 160 Mm - 50.0 M.3.A Detailed Description Of The Subject Of The Order Is Set Out In The Terms Of Reference (Swz) Attached To This Contract, Technical Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And, Additionally, The Bill Of Quantities. The Bill Of Quantities Is An Auxiliary Document For The Preparation Of The Offer. 4. The Works Must Be Performed In Accordance With The Construction Documentation, Applicable Regulations, Standards And On The Terms Agreed In The Contract.5. The Contractor Assumes The Obligations Specified In The Contract And Related To The Performance Of Services And Construction Works. The Contractor Undertakes To Perform All Obligations Arising From The Contract For The Execution Of The Order In Good Faith And With Professional Diligence. In Particular, The Contractor Is Obliged To Comply With Legal Provisions. The Contractor Is Fully Responsible For The Performance Of A
Contact Information
Address
Mayor Of Ustka Commune,Ustka,76-270,Pomorskie,Pl636 - Słupski
Email
zp@ustka.ug.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120770972
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.