The Subject Of The Order Is A Service Called: Mechanical Winter Maintenance Of Streets Using Plows, Sanders And Salt Spreaders. According To The Common Dictionary Of Public Procurement, The Order Includes: Cpv 90620000-9 Snow Removal Servicescpv 90630000-2 Icing Removal Services4.2.The Subject Of The Order Includes:4.2.1.List Of City Streets With The Following Surfaces: 1) Bituminous For Winter Maintenance Using Salt Pans And Plows, With A Total Area Of 355,052.7 M2 (Appendix No. 1 To The Swz) 2) Bitumen For Winter Maintenance Using Salt Sprayers And Plows - The First Order Of Maintenance, With A Total Area Of 125,154 M2 (Appendix No. 1A To The Swz) 3) Concrete For Winter Maintenance Using Sandblasters And Plows Plows With A Total Length Of 13,031 M (Appendix No. 2 To The Swz)4) Concrete For Winter Maintenance Using Sandblasters And Plows - The First Order Of Snow Removal, With A Length Of 1,322 M (Appendix No. 2A To The Swz)5) Ground For Winter Maintenance Using Plows (And Possibly Sandblasters), With A Total Length - 13,329 M (Appendix No. 3 To Swz)4.2.2.As Part Of The Execution And Settlement Of The Order, The Contractor Will Use Net Unit Prices For: 1) Sprinkling 100 M2 Of A Street With A Bituminous Surface With Brine With A Concentration Of 15 G/M22) Sprinkling 100 M2 Of A Street With A Bituminous Surface With Brine With A Concentration Of 20 G/M23) Sprinkling 100 M2 Of A Street With A Bituminous Surface With Brine With A Concentration Of 15 G/M2 Including Snow Removal4) Sprinkling 100 M2 Of Bituminous Street With Brine With A Concentration Of 20 G/M2 Including Snow Removal5) 1 Hour On Duty Based On The Solar Plant Operator6) 1 Hour On-Duty Home Solar Operator7) 1 Hour Sandblaster Operation8) 1 Hour Operation Of The Vehicle With The Plow9) 1 Hour Grader Operation10) 1 Hour Bulldozer Operation11) 1 Hour Operation Of The Snow Plow12) 1 Hour Excavator Work While Removing Snow13) 1 Hour Loader Operation When Removing Snow14) 1 Hour Work Of The Dump Truck When Removing Snow15) 1 Hour Work Of A Manual Worker When Removing Snow16) 1 Ton Of 30% Sand-Salt Mixture4.2.3.Detailed Requirements Of The Ordering Party: 1.Coordinators Will Decide On An Ongoing Basis Whether To Introduce On-Duty Duties (At The Base Or At Home) For Equipment Operators. From The Introduction Of Shifts To Their Cancellation, The Indicated Telephone Numbers Of The Contractors And The Employers Coordinators Must Be Open 24 Hours A Day.2.Decisions On Sending The Type And Quantity Of Equipment (Including Brine Concentration) Will Be Made Jointly By The Action Coordinators (Or Persons And Entities Indicated By The Ordering Party) Based On The Current Weather Conditions And Weather Forecasts.3.The Contractor Will Take Effective Snow Removal Activities Within A Maximum Of 1 Hour From Receiving The Notification From The Ordering Party, Regardless Of The Day Of The Week And The Time At Which He Received The Notification; In The Event Of Night Snowfall, Winter Maintenance Work Should Be C
Contact Information
Address
City Of Bielsk Podlaski,Bielsk Podlaski,17-100,Podlaskie,Pl842 - Łomżyński
Email
um@bielsk-podlaski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120770898
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.