|
1. The Assumption Of The Planned Investment Is To Improve Energy Efficiency And Rebuild The Existing Rooms To Meet The Needs Of Two Departments Of The Municipal Police Headquarters In Bydgoszcz. The Investment Is Carried Out In The Design And Build Formula. The Order Concerns The Implementation Of Construction Work Consisting In The Preparation Of Multi-Discipline Design And Cost Estimate Documentation For The Reconstruction Of The Administrative Building Of The Former Bydgoszcz-Szwederowo Kp Together With The Accompanying Infrastructure. Obtaining All Required Opinions, Arrangements And Decisions For The Prepared Documentation, Including The Decision On The Building Permit. Carrying Out Construction Works Based On The Developed Design Documentation, On The Basis Of A Building Permit Decision And Notification For Works That Do Not Require A Decision, Which Include The Implementation Of Moisture And Thermal Insulation Of Foundation And External Walls, Insulation Of The Buildings Roof, Replacement Of Window Frames, Reconstruction Of The Water And Sewage System, And A New Installation Of Central Heating And Mechanical Ventilation With Air Conditioning. Construction Of Evacuation And Emergency Lighting Along With New Low-Voltage Installations. 2. The Subject Of The Order Includes The Provision Of Architectural Services And Construction Works, In Particular: Earthworks, Construction Works In The Field Of Buildings, Concreting, Masonry Works, Steel Structures, Roofing, Insulation Works, Thermal Insulation, Facade Works, Plastering, Joinery Works, Covering Floors And Walls, Painting And Glazing Works, Finishing Works, Other, Repair And Renovation Works, Works Electrical Installations, Wiring And Electrical Installation Works, Water, Sewage And Sanitary Installation Works, Installing Central Heating, Installing Ventilation And Air-Conditioning Devices, Water, Sewage And Sanitary Installation Works, Demolition Works, Works On Various Surfaces3. A Detailed Description Of The Subject Of The Order Is Included In: 1) Functional And Utility Program - Annex No. 1 To The Swz, 2) Drafted Provisions Of The Agreement - Annex No. 2 To The Swz.
|