1. The Task Is Carried Out In The Design-Build Formula. The Planned Investment Involves The Design And Construction Of Two Open Retention Reservoirs In Nieprowice And Probołowice, Located In The Złota Commune. The Scope Of The Task Will Include: - Design Of Retention Reservoirs With Accompanying Infrastructure As Well As Restoration And Development Of The Area, - Construction Of Open Retention Reservoirs With Drains With A Sealed Bottom, - Construction Of Damming Devices, - Reconstruction Of Culverts, - Construction Of Protective Barriers, - Construction Of Small Architecture, - Tidying Up The Existing Greenery That Interferes With The Creation Of The Retention Reservoir, - Reconstruction Of Drainage Ditches Within The Investment, - Reconstruction Of Existing Roads, - Marking And Equipping The Infrastructure With The Equipment Required By Relevant Regulations, Including Occupational Health And Safety And Fire Protection Equipment, - Cooperation With The Ordering Party And The Supervision Inspector In Order To Obtain All Appropriate Permits And Documentation Necessary For The Implementation Of The Task, Including Obtaining Information From The Authority Responsible For Water Management (Including Preparation Of The Design And Descriptive Part Required By The Application) - Preparation Of Complete Design Documentation Along With Arrangements Required By The Provisions Of Construction Law And Obtaining Consent From The Architectural And Construction Administration Authority, Complete Design Documentation Should Include: 1. Development Of A Plot Or Area Development Design And An Architectural And Construction Design To The Extent Necessary To Obtain Consent From The Architectural And Construction Administration Body - 3 Or Electronic Copies, 2. Preparation Of Bills Of Quantities And Cost Estimates - 1 Copy In Paper Version And 1 Electronic Version In Pdf Format - After The Development And Approval Of The Design Documentation And Before The Commencement Of Construction Works Covered By A Given Documentation, The Contractor Is Obliged To Prepare And Submit To The Ordering Party A Detailed Cost Estimate For Construction Works, Prepared On The Basis Of The Approved Design Documentation. After Completing The Construction Works, At The Latest Upon Notification Of Readiness For Final Acceptance, The Contractor Is Obliged To Submit To The Ordering Party An As-Built Cost Estimate, Prepared On The Basis Of The Actual Construction Works. The As-Built Cost Estimate Should Take Into Account The Actual Scope And Quantity Of Works Performed, With The Separation Of The Value Of Works Related To Each Retention Reservoir. The Document Should Enable Identification Of The Scope Of Work Performed And Their Comparison With The Cost Estimate Prepared On The Basis Of The Approved Design Documentation.3.Information On Safety And Health Requirements. Before Starting Design Work, The Contractor Is Obliged To Obtain And Verify Data And Materials Necessary For The Implementation
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120670288
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.