Dyke Construction Work – Expansion Of The Wartenburg-Dabrun Dike Km 0.00-1.85 - Dike Construction. Upgrading Of A Dike With Partial Realignment Over A Length Of 1850 M. The Dike Is Constructed As An Earth Body (Height Up To 4M). The Sealing Is Done With Earth Materials As Well As With Sheet Piling (Length Up To 12M). Creation Of A Dike Side Ditch. Creation Of A Dike Defense Or Agricultural Path With Paving And Asphalt Including Culverts. Topsoil Work: Deliver And Install 89,000 M² Of Sheet Piling: 3,500 M² Remove Soil: 47,000 M³ Stored Soil Install: 30,000 M³ Deliver Soil Install: 30,000 M³ Deliver Geotextile Install: 10,000 M² Deliver Stone Fill Install: 7,200 T Sealing Material (Mineral) Deliver Install: 21,000 M³ Dispose Of Excess Soil: 13,000 T Create Gravel Base Layer: 10,000 M² Create Asphalt Base Layer: 7,000 M² Create Paving Surface: 3,000 M² Care Lawn Seeding: 72,000 M² (6 Years)
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120610864
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.