|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 9 Mtr. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 33 Kv / 11 Kv Cable, Stay Rod, Pin Insulator / Disc Insulator, 33/11 Kv Cross Arm, Dropper Channel, Top / T-Off Channel, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Installation Of Stay Set Complete With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Digging, Laying And Back Filling Of 11 Kv Xlpe 3X185 Sqmm Allu. Cable Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Gi Pipe 6 Dai /Clamps Etc. Required For Proper Completion Of The Work As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. , Filling Of 11 Kv 3X185 Sqmm Heat Shrinkable Jointing Kit (Indoor/ Outdoor) Type For Compeletion Of Work. Including Cable Hoisting Jumfering Work Etc. , Carriage And Fixing Of Following Ancillary Equipment, Accessories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Top Channel , Dropper Channel , Ms Bracing Angle , 11 Kv Disc Fitting , Nut & Bolt , Clamp With Nut & Bolt , Hdpe Pipe 120 Mm , Gi Pipe 6 Dai , Dismantling And Removal Of Existing Line (Conductor/Pole) From The Various Area Preparing Their Coils And Then Stacking In The Respective Jes (Store) Direction Of Engineer Incharge. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc.Required For Proper Completion Of Work.
|