Engineering Design Services – Planning Of The Budafoki Út Tram Line - North. The Subject Of The Planning Task Is The Planning Of The Northern Section Of The Budafoki Út Tram Line (Part 1), In Addition To The Preparation Of The Construction Permit And Construction Plans, The Completion Of The Permit Procedures, The Obtaining Of Building Permits And All Other Necessary Legally Binding Permits And Consents. In Addition, The Designers Task Is To Compile The Bidding Tender Documentation (Execution Documentation) For The Selection Of The Contractor, The Feasibility Study, The Environmental Impact Study And, If Necessary, The Environmental Impact Assessment. The Goal Is The Professional Execution Of A Modern, Urbanistically Emphasized, Technical Design That Treats The Built-In Nature And Green Elements Of The Environment As A Given And Takes Them Into Account As A Value To Be Preserved, Ensuring Traffic And Architectural-Urban-Architecture Connections Between Different Parts Of The City. During The Basic Task, The Designers Obligation Is To Fully Determine The Following Specific Facilities And Specialized Elements At The Locations Indicated By The Customer: • Decision Preparation Document And The Tasks To Be Performed In It: - Route Survey For The Entire Planning Area (Also For The Northern, Central And Southern Sections), From Irinyi József Utca To The Budafok Railway Station - Cross-Sectional Survey In Relation To This Planning Area - Only Between Irinyi József Utca And Építéz Utca - Road Traffic Modeling For The Affected Network, Route 6 And Nagytétényi Route Xxii. Also Considering Its District Section - Detailed Traffic Investigation For The Intersections Of Etele Út / Fehérvár Út, Budafoki Út / Dombóvári Út And Irinyi József Út / Bogdánffy Út. • Planning Of Approx. 3.4 Km Of New Track And Related Public Space On The Bogdánffy Út – Budafoki Út Track, Up To Építéz Út • 0.35 Km Of New Track On Hengermalom Út, Between Szerémi Út And Budafoki Út • Establishment Of A Terminal At Építéz Út • New Junction Turning Track At The Intersection Of Etele Út / Fehérvári Út • Hauszmann Alajos Utca Road Capacity Expansion Between Szerémi Út And Budafoki Út • Complete Renovation Of The Affected Public Areas • Design Of Barrier-Free Platforms The Planning Obligation Covers All Planning Objects And All Affected Locations In Every Planning Phase. It Is The Designers Responsibility To Ensure That The Various Design Phases Build On Each Other, Are Consistent With Each Other And Fully Comply With The Relevant Legal, Official And Technical Regulations. Design Management As An Optional Task Is The Responsibility Of The Winning Bidder According To The Technical Description And Below. The Option Consists Of Two Work Parts, These Are As Follows: • General Tasks, • Individual Tasks - A Maximum Of 60 Engineering Days The Entire Design Project Will Consist Of 3 Separate Tasks As Planned: Task 1: Northern Section: Irinyi József Utca – Építész Utca (Subject Of This Public Procurement Procedure) Task 2: Middle Section: Építész Utca – Savoya Park Task 3: Southern Section: Savoya Park – Budafok Railway Station A Planning Tasks Are Built On Each Other
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120561840
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.