|
Construction Work For Swimming Pool – Sv-Jwa-261112-001 - Prs: New Concept For The Prinzregentenstadion Sauna, Bathing Water Technology. As Part Of The Redesign Of The Sauna In The Prinzregentenstadion In Munich, The Bathing Facilities Will Be Renewed And Expanded. The Services Include Dismantling, Rebuilding And Adapting Pipes, Fittings, Cold And Warm Pool Technology, Measurement, Control And Regulation Technology As Well As The Expansion Of The Ultrafiltration System. Added To This Are Thermal Insulation, Fire Protection, Work And Assembly Planning, Testing, Documentation, Commissioning, Acceptance With Coloring Test And Trial Operation. The Work Will Be Carried Out In The Existing Building While Some Of The Adjacent Areas Continue To Operate. Essential Quantity Information: Dismantling: Approx. 300 M Of Pipes Dn 15-200, 20 Fittings, 10 Displays/Sensors, 3 Uf Modules And 1 Pre-Filter System. Pure Water: Approx. 510 M Pvc-U Pipes D 25-125 Splash Water: Approx. 318 M Pe-Hd Pipes Dn 50-160 Fittings/Valves: Approx. 90 Pieces Pool Technology: 1 Multi-Layer Filter System, Conversion 1 Surge/Pure Water Tank, 2 Plate Heat Exchangers, 2 Heat Exchanger Pumps, 2 Filter Pumps As Well As Measuring, Dosing, Control And Interface Technology. Pool: 1 Warm/Massage Pool Outside, Approx. 10, 42 Sqm; 1 Cold Water Plunge Pool Outside, Approx. 1.77 Sqm, Built-In Parts For 1 Kneipp And 1 Cold Pool Inside. Ultrafiltration: Expansion From Approx. 27 To 36 M³/H, 3 Uf Modules Of 80 Sqm Each, 2 Filter Containers. Insulation/Fire Protection: Approx. 238 M Of Pipe Insulation, 9 F-90 Bushings, 49 Fire Protection Insulation Sleeves. Other: 56 Core Holes, Approx. 190 M Mounting Rails. Commissioning/Functional Tests, Coloring Test For 4 Pools, Integrative Tests, 2 Weeks Of Trial Operation, Inventory Documentation And Instruction
|