Architectural And Related Services – Gkh Bonn, Conversion And Expansion To Single-Family Homes. Description Of The Planning Task And The Construction Measure: The Structural Measure Envisages A Concentration Of The Two Operating Locations St. Elisabeth And St. Petrus Of The Bonn Community Hospital At The Current St. Petrus Operating Location. To Implement The Project, Structural Measures Are Necessary At The St. Petrus Site, Which, On The One Hand, Take Into Account The Existing Investment Requirements And, On The Other Hand, Create The Necessary Capacities For The Target Structure. The Bonn Community Hospital Currently Provides Its Inpatient Services Primarily At The Two Operating Locations St. Petrus And St. Elisabeth. The St. Petrus And St. Elisabeth Operating Locations Are Located In Close Proximity (< 1 Km). Particularly In The Internal Medicine (Lg 1.1) And Surgical (Lg 9.1) Areas, Parallel Structures Are Maintained At Both Operating Locations - Although The Focus Is Medically Different. Planning And Conception Principles The Existing Building Stock Will Be Adapted To Todays Medical, Functional And Operational Requirements And Will Be Upgraded Through Targeted Structural Additions. An Essential Part Of The Considerations So Far Is The Construction Of A New Building Wing In The Extension Of The Existing Building, Component C/D. The Structural Expansion Creates Necessary Areas And Spatial Connections That Cannot Be Realized In The Existing Building. The Expansion Enables The Implementation Of Todays Requirements For Room Sizes, Functionality, Operational Organization And Modern Medical Care. Eligibility For Approval The Essential Planning And Building Law Framework Conditions Have Already Been Discussed In Advance With The Responsible Building Authority. Part B Of The Building Remains Only Partially Usable, As Preliminary Investigations Have Shown That The 2Nd And 3Rd Floors Can Neither Be Used Nor Modernized Due To Structural Defects. Kitchen Planning - Patient Care Taking Into Account An Ever-Increasing Shortage Of Skilled Workers, Rising Costs, Larger Space Requirements And Existing Practice, We Continue To Forego Our Own Food Supply. The Location Is Supplied Externally. Parking The Required Number Of Parking Spaces Can Generally Be Proven, Taking Into Account The Requirements Of The City Of Bonn. The Current Considerations Include The Construction Of An Underground Car Park On The Garden Side Of The St. Petrus Location. Supply / Disposal The Dimensions Of The Material Storage And Disposal Areas On The Individual Levels Should Be Adapted To Future Needs. The Limited Storage Space Available On Each Floor Should Be Used As Efficiently As Possible By Using A Digital Storage And Ordering System. Construction Phase Formation First Construction Phases In Areas A And B Will Be Implemented. With Its Completion, The Necessary Bed Capacities Will Be Available
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120561550
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.