Tenders Are Invited For Thermal Modernization Of Part Of The Facility Of The Municipal Office In Dębno, Incl ... in Poland
Tender Notice
TenderID
120555732
Tender Brief
Tenders Are Invited For Thermal Modernization Of Part Of The Facility Of The Municipal Office In Dębno, Including A Photovoltaic Installation And An Energy Storage Facility.
The Subject Of The Proceedings Is The Following Scope Of Works: A) Insulation Of The Foundation Wall (Styrodur Slabs Λd= 0.036 W/Mk, Thickness 12.0 Cm) Along With Accompanying Works - Renovation Of Foundations (Concrete) And Foundation Walls (Concrete) - Approx. 60.90 M2; B) Insulation Of The Plinth Walls With Accompanying Works (12 Cm Thick Styrodur Boards, Λd = 0.031 W/Mk) - Approx. 65,053 M2, - Renovation Of The Plinth With Thermal Modernization Of The Facade Walls; C) Insulation Of The Building Walls Above The Plinth Along With Accompanying Works (15 Cm Thick Styrofoam Boards, Λd = 0.033 W/Mk) - Approx. 521,144 M2, Including: - Renovation Of The Part Above The Plinth With Thermal Modernization Of The Facade Walls, - Balustrade Of The External Descent To The Additional Entrance On The Northern Facade, - Steel Window Grilles; D) Thermal Modernization Of The Roof With Accompanying Works (Thermal Insulation In The Form Of Pir Boards 5.0 Cm Thick, Λd = 0.022 W/Mk) - Thermal Modernization Of The Flat Roof - Approx. 255 M2; E) Construction Of An Installation Of Photovoltaic Panels With A Peak Power Of Up To 34.65 Kwp On The Roof Of The Building, Along With An Energy Storage Facility With A Capacity Of Up To 40 Kwh And A Power Of Up To 35 Kw, Along With Accompanying Infrastructure; F) Installation Of A Fixed Window In Aluminum Window Joinery In Place Of The Currently Installed Glass Windows (Heat Transfer Coefficient U = 0.9 W/M2k) - Replacement Of The Filling Of The Window Opening With Glass Blocks With Anti-Burglary Window Joinery Above The Main Entrance On The Northern Elevation - Approx. 2.40 M2; G) Other Works: - Roofs Over The Main And Additional Entrances On The Northern Elevation, - Renovation Of The External Entrance (Northern Elevation), - Other Renovation Works - Disassembly And Reassembly Of Information Boards; H) As Part Of The Investors Representation, The Contractor Undertakes The Following Obligations: - Conducting The Formal And Legal Procedure For Connecting The Pv Installation To The Network Operator (Enea Operator), - Reporting The Pv Installation To The State Fire Service, - Notifying The Completion Of The Works And Obtaining Technical Acceptance Of The Relevant Network Managers, - Obtaining An Occupancy Permit. The Colors Of The Façade And Its Elements Should Be Adopted In Accordance With The Provisions In The Design Documentation. The Detailed Scope Of Works To Be Performed Is Specified In The Guidelines For The Valuation Of The Offer According To Annex No. 3 To The Swz, As Well As In The Design Documentation And Technical Specifications For The Execution And Acceptance Of The Works.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120555732
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.