Scope Of Works:Building 38:• Forging Steel Door Frames Or Door Grates With An Area Of Over 2 M2 From The Wall - Dismantling Hinges (21 Swing Gates)• Steel Swing Gates, Insulated, 17 Pieces - Delivery And Assembly To The Concrete Structure Of The Hall (Locking With A Pin Inserted Into A Galvanized Pipe Embedded In The Parking Lot Surface And A Foot With A Spring)• Garage Doors Insulated Steel Turn-Only Doors With A Gate, 4 Pieces - Delivery And Assembly To The Concrete Structure Of The Hall (Locking With A Pin Inserted Into A Galvanized Pipe Embedded In The Parking Lot Surface And A Foot With A Spring)• Punching Holes With An Area Of Up To 0.05 M2 In Gravel Concrete Elements Up To 20 Cm Thick• Embedding Hot-Dip Galvanized Pipes In The Parking Lot Surface• Concreting The Holes In The Ceilings And Walls With An Area Of Up To 0.1 M2 And A Depth Of Over 10 Cm• Recovery And Sale Of Scrap Building 39:• Forging Steel Door Frames Or Door Grates With An Area Of Over 2 M2 From The Wall - Unscrewing The Hinges From The Pole (21 Swing Gates)• Steel Side-Hinged Garage Doors, Insulated, 17 Pieces - Delivery And Assembly To The Concrete Structure Of The Hall (Locking With A Pin Recessed Into The Tube Galvanized Steel Embedded In The Parking Lot Surface And A Foot With A Spring)• Insulated Steel Side-Hinged Garage Doors With A Wicket, 4 Pcs. - Delivery And Assembly To The Concrete Structure Of The Hall (Blocking With A Pin Inserted Into The Galvanized Tube Embedded In The Parking Lot Surface And A Foot With A Spring)• Punching Holes With An Area Of Up To 0.05 M2 In Gravel Concrete Elements Up To 20 Cm Thick• Embedding Hot-Dip Galvanized Pipes In The Parking Lot Surface• Concreting Of Holes In Ceilings And Walls With An Area Of Up To 0.1 M2 With A Depth Of Over 10 Cm• Scrap Recovery And Salebuilding 44:• Forging Steel Door Frames Or Door Grates From The Wall With An Area Of Over 2 M2 - Unscrewing The Hinges From The Column (21 Swing Gates)• Steel Side-Hinged Garage Doors, Insulated Pcs. 17 - Delivery And Assembly To The Concrete Structure Of The Hall (Locking With A Pin Recessed Into The Galvanized Tube Embedded In The Parking Lot Surface And A Foot With A Spring)• Insulated Steel Swing Gates With A Wicket, 4 Pcs. - Delivery And Assembly To The Concrete Structure Of The Hall (Locking With A Pin Recessed Into The Galvanized Pipe Embedded In The Parking Lot Surface And A Foot With A Spring)• Punching Holes With An Area Of Up To 0.05 M2 In Gravel Concrete Elements Up To 20 Cm Thick• Embedding Hot-Dip Galvanized Pipes In The Parking Lot Surface• Concreting Of Openings In Ceilings And Walls With An Area Of Up To 0.1 M2 With A Depth Of Over 10 Cm• Scrap Recovery And Salethe Scope Of All Works And Requirements Is Described In Detail In Annex No. 4 To The Swz (Stwiorb) And Annexes No. 5-7 To The Swz (Construction Bills For Buildings No. 38, 39 And 44).
Contact Information
Address
11 Military Economic Department,Bydgoszcz,85-674,Kujawsko-Pomorskie,Pl613 - Bydgosko-Toruński
Email
11wog.szpub@ron.mil.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120555721
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.