|
4.1.The Subject Of The Order Is The Implementation Of The Task Titled: Construction Of Home Sewage Treatment Plants In The Grabowiec Commune In The Design And Build Formula.4.2.The Order Includes In Particular: 1) Development Of Complete Design Documentation Separately For Individual Locations Of Household Biological Sewage Treatment Plants (Pboś), Together With The Performance Of The Necessary Tests, Obtaining The Required Arrangements, Opinions, Notifications, Permits And Other Decisions Required By Law; 2) Performance Of Construction And Assembly Works, Based On The Prepared Documentation, Including The Delivery, Assembly, Commissioning And Commissioning Of A Total Of 56 Household Biological Sewage Treatment Plants, Including: A) 27 Pboś Units For 1-4 Pboś,B) 20 Pcs. Pboś For 5-6 Pw,C) 7 Pcs. Pboś For 7-9 Pw,D) 2 Pcs. Pboś For 10-12 Pw,3) Performance Of All Works, Deliveries, Services, Activities, Tests, Tests, Start-Ups, Arrangements And Documentation Necessary For The Complete Execution, Acceptance And Handing Over Of The Subject Of The Agreement For Use.4.3.Among The 56 Pboś, One Sewage Treatment Plant Is Intended To Service The Volunteer Fire Department Station In The Town Of Tuczępy And Is Included In The 10-12 Pe Category. In Addition, 35 Pboś Should Be Constructed In A Version Equipped With A Pumping Station For Treated Sewage Integrated With The Tank.4.4.The Scope Of The Order Also Includes All Works, Deliveries, Activities, Tests, Tests, Arrangements And Documentation Necessary For The Complete Execution, Commissioning, Acceptance And Commissioning Of The Subject Of The Order.4.5.A Detailed Description Of The Subject Of The Order, Including Functional, Operational And Technical Requirements, Scope Of Design And Construction Works, Pboś Parameters, Requirements For Materials And Devices, Documentation, Tests, Acceptances And Other Obligations Of The Contractor, Is Specified In The Functional And Utility Program (Ffu), Constituting Annex No. 1 To The Swz.
|