1. The Subject Of The Order Is The Construction Of A Water Supply Network With Branches Within The Road In Wola Wydrzyna Commune. Sulmierzyce, Including In Particular: A Summary Of The Length Of The Network, Branches And Switching Of Existing Connections To The New Water Supply Network.1. Water Supply Network1.1. Within The Provincial Road - Section 1 - 44, Φ 160 L = 1513.60 Moutside The Provincial Road - Section 44 - 47, Φ 160 L = 41.60 M 1.2. Replacement Of The Water Pipeline (Outside The Provincial Road - Included In The Bill Of Quantities And Described In The Land Development Plan, Drawing No. 1) - Section 46 - 47 - 48, Φ 160 L = 42.00 M 1.3 Branches From The Water Pipeline Outside The Provincial Roads Lane 5 - 5 Φ 90 L = 3.00 M 23/5 Φ 40 L = 6.50 M Total Branches Outside The Provincial Road Φ 40 L = 9.50 M Φ 90 L = 3.00 M 1.4. Branches Within The Provincial Roadsection Diameter Length In Protective Pipe Without Protective Pipe2 – 2 Φ 40 1.5 M - +5 – 5 Φ 40 1.0 M - + 9 – 9 Φ 40 2.7 M - +10 – Hp2 Φ 90 2.0 M - +13 – 13 Φ 40 5.4 M - + 18 – 18 Φ 40 1.0 M - +21 – Hp3 Φ 40 3.0 M - +22 – 22 Φ 40 16.5 M + -23 – 23/1 Φ 110 17.6 M + -27 – Hp4/1 Φ 90 15.7 M + -29 – 29 Φ 40 16.1 M + -30 – 30 Φ 40 16.0 M + -31 – Hp5 Φ 90 3.0 M - + 32 – 32 Φ 40 15.6 M + -33 – Hp6 Φ 90 3.0 M - +34 – 34 Φ 40 15.7 M + -35 – 35 Φ 40 15.50 M + -38 – Hp7 Φ90 12.20 M + -39 Switching The Existing Connection Crossing The Planned Network40 – 40 Φ 40 13.40 M + -23 – 23 – 23/2 – 23/3 – 23/5 – 23/5 - Hp4 Φ 110 57.60 M23/3 – 23/3 Φ 40 9.90 M Total Φ 40 – 114.81 M;Φ 90 – 38.90 M Φ 110 – 75.20 M 1.5 Switching Between The Existing And Planned Water Supply Section From Point Diameter Length Casing Pipe 2 Φ 40 10.0 M - 9 Φ 40 9.0 M - 13 Φ 40 10.0 M - 22 Φ 40 7.0 M - Hp4 Φ 90 6.0 M - 29 Φ 40 6.0 M - 30 Φ 40 6.5 M - 32 Φ 40 23.0 M - 34 Φ 40 11.0 M - 35 Φ 40 19.0 M - Hp4/1 Φ 90 6.0 M - 23/5 Φ 40 17.0 M - Total Φ 90 L = 12.0 M; Φ 40 L = 130.5 M The Investment Area Is Located In The Area Of Archaeological Sites. The Contractor Is Obliged To Ensure Constant Archaeological Supervision Over The Earthworks Related To This Investment And To Comply With All Guidelines Contained In The Permit Of The Provincial Conservator Of Monuments Wuoz-Za.5161.19.2026.Am Of March 31, 2026. 2. Warranty The Contractor Will Provide At Least A 5-Year Warranty For The Completed Subject Of The Order. The Warranty Period Is Equal To The Warranty Period. If The Opz Defines A Longer Warranty For Given Elements, The Longer Warranty Applies. If The Content Of The Design Documentation And The Stwiorb Contain Any Provisions Regarding The On-Site Inspection Or Evidence Or Conditions For The Implementation Of The Subject Of The Order, E.G. Rules For The Introduction Of Additional Or Replacement Works, Acceptance Of Works, Method Of Settlement, Which Are Not Reflected In The Content Of This Swz And The Draft Provisions Of The Agreement Or Are Inconsistent With Them, The Provisions Of The Swz And The Draft Provisions Of The Agreem
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120554030
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.