|
The Subject Of The Contract Is A Construction Project In The Design-Build System, Including The Preparation Of Comprehensive Design Documentation Along With The Implementation Of An Investment Consisting In The Renovation Of A Sports Complex - A Sports Locker Room And A Football Pitch Along With Technical Infrastructure In The Town Of Skrzypiec In The Lubrza Commune In The Scope Of: 1) Development Of Comprehensive Design Documentation: A) Including Obtaining The Consent Of The Competent Authority To Carry Out The Works (Building Permit Decision/Notification Without Objection) Along With The Necessary Other Decisions Administrative, Permits, Arrangements, Water Law Notifications/Permits And Opinions, Including, Among Others: Hydrological And Verifications, The Need To Attach To Which Results From Separate Acts; B) Developed On The Basis Of Applicable Legal Regulations; C) Which Includes A Construction Design (Land Development Design, Architectural And Construction Design, Technical Design), Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities, Geotechnical Opinion, Industry Designs, Executive Cost Estimate; D) Including, Depending On The Needs, An Executive Design, I.E. If The Data And Information Contained In The Construction Design Are Required Detailed Solutions, E.G. During The Works Carried Out Or In The Case Of Reporting Construction Works, Enabling Verification Of The Construction Works Performed Together With The Included Solutions, E) Prepared On A Current Map For Design Purposes Prepared By An Authorized Surveyor In Accordance With The Act Of May 17, 1989, Geodetic And Cartographic Law, The Act Of July 7, 1994, Construction Law And Implementing Acts To The Above-Mentioned. 2) Execution Of Construction Works Together With The Necessary Technical Infrastructure And Equipment, Carried Out On The Basis Of Design Documentation Prepared By The Contractor, Including In Particular: A) Renovation Of The Pitch With Accompanying Infrastructure In The Scope Of: - Maintenance Of The Natural Pitch, - Replacement Of Pitch Equipment, Including: Goals, Ball Catches, Fencing, Gates, Wickets, Chairs, - Hardening Of The Area And Construction Of Access To The Locker Room, - Replacement Of Lighting In The Field Of Masts And Lighting Fixtures With Power Linesb) Restoration To Their Original Condition And Ongoing Renovation Of Existing Earth Embankments, C) Topsoiling And Maintenance Of The Area, D) Renovation Of The Cloakroom Building In The Scope Of: - Insulating The Facility From The Outside Along With Finishing With Silicate Plaster, - Replacement Of Internal And External Window And Door Joinery Together With Internal And External Window Sills, - Renovation Of Existing Walls - Construction Of Lightweight Walls In System Construction Inside Rooms With Finishing, - Works On Internal Electrical Installations, - Works Performed In Existing Rooms In The Scope Of Finishing Works, I.E. Floors, Walls, Ceilings And Accompanying Works
|