Description Of The Subject Of The Order.1.The Subject Of This Procedure Are Construction Works Consisting In The Construction Of A School Football Pitch With A Natural Surface Along With Equipment (Ball Catchers, Goals, Football Shelters) And The Necessary Technical Infrastructure (Irrigation System With The Necessary Power Supply) And Land Development At The Public Primary School In Zaręby. The Construction Works Include In Particular: - Demolition Of The Existing Running Track (Selection And Removal Of The Existing Surface, Disassembly Of The Concrete Edges Of The Running Track, Removal Of Demolition Material) - Earthworks, - Selecting The Ground For The Pitch Layers, - Construction Of The Pitch Edges, - Construction Of The Substructure And Layers Of The Pitch, - Construction Of The Pitch Surface - Grass Surface, - Construction Of Ball Catches, - Installation Of Pitch Equipment, - Construction Of An Underground Water Supply System For Pitch Irrigation, - Tidying Up The Area, Leveling And Raking, And Sowing The Area Around The Pitch With Grass. Note: As Part Of The Execution Of The Subject Of The Order, It Is Necessary To Perform Only Electrical Work Necessary For The Proper Functioning Of The Pitch Irrigation System.2. A Detailed Description Of The Subject Of The Contract Is Presented In The Annexes To The Swz, Which Constitute: A) Design Documentation - Annex No. 10 To The Swz; B) Technical Specification For The Execution And Acceptance Of Construction Works (Construction, Sanitary And Electrical Industries) - Annex No. 11 To The Swz; The Task Also Includes Incuring Costs Resulting, Among Others, From: - Surveying Services (Works Measurement - Carrying Out An As-Built Inventory); - Restoring The Adjacent Area To The Condition As Before The Commencement Of The Works; - Carrying Out Tests Necessary For The Proper Execution Of The Works; - Securing The Existing Telecommunications, Sewage And Water Supply Networks; - Removing Collisions With External Devices And With Above-Ground And Underground Infrastructure That Have Not Been Inventoried; - Removal Of Trees And Shrubs Colliding With The Planned Investment; - Costs Of Excavation And Removal And Disposal Of Excavated Material; - Own Management And Storage Of Excess Soil; - Securing The Construction Site (Excavations) For The Duration Of The Works. Other Information: - In The Area Covered By The Study, The Following Utilities Are Located: Water Supply Network, Overhead And Cable Power Grid, Telecommunications Network. - Works Located At The Intersection With Underground Utilities Should Be Performed Manually After Prior Notification Of The Works To The Utility Owners. - Technologically Adapt The Works To The Conditions Surrounding Area. Security Of Existing Telecommunication Cables Before Commencing Work Close To The Telecommunications Infrastructure, The Commencement Of Work Should Be Notified In Order To Establish Supervision By The Technical Services Of Orange Polska S.A. After Completing The C
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120553953
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.