|
1. The Subject Of The Order Is The Development Of Multi-Disciplinary Design Documentation For An Indoor Swimming Pool Along With Obtaining The Necessary Administrative Arrangements And Decisions, Including A Building Permit.2.The Scope Of The Subject Of The Order Includes In Particular The Preparation And Submission To The Ordering Party Of The Following Studies: 1) Concept With A Functional Program And Visualizations, 2) Research And Geotechnical Opinion To The Extent Necessary For The Proper Performance Of Construction Works, 3) Architectural And Construction Design Together With A Land Development Design, 4) Technical/Executive Design, Which Should Include At Least The Following Studies: A) Structural And Construction Design Together With The Necessary Calculations And Results Of Static And Strength Calculations, B) Design Sanitary Industry Along With The Necessary Hydraulic Calculations, Device Parameters, Including Installation Regulations, Dimensions Of Elements And Installations, Characteristic Cross-Sections, Developments, Lists Of Installation Elements And Devices, C) Design Of The Electrical Industry Along With The Necessary Calculations Of Electrical Parameters, Lists Of Devices With Their Technical Data, D) Design Of The Telecommunications Industry Along With Lists Of Devices And Their Technical Data, E) Interior Architecture Design, F) Land Development Design, G) Technical Specifications For Construction And Acceptance Works.5) Fire Scenario, In Accordance With The Regulation Of The Minister Of Internal Affairs And Administration Of September 17, 2021 On Agreeing On The Development Design Of A Plot Or Area, Architectural And Construction Design And Technical Design In Terms Of Fire Protection,6) Fire Safety Manual With Equipment, In Accordance With The Regulation Of The Minister Of Internal Affairs And Administration Of June 7, 2010 On Fire Protection Buildings, Other Structures And Areas (Consolidated Text: Journal Of Laws Of 2023, Item 822, As Amended),7) Greenery Inventory, Including Dendrological One, Greenery Protection Project, Compensatory Plantings Project.3.As Part Of The Contractual Remuneration, The Contractor Is Also Obliged To Exercise Authors Supervision Within The Scope Referred To In Art. 20 Section 1 Point 4 Of The Act Of July 7, 1994 Construction Law.4.A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 1 To The Swz. Additional Information: The Ordering Party Requires That The Maximum Heat Transfer Coefficient For The Entire Joinery (Glazing And Profiles Considered Together) Is K≤ 0.9. Triple Glazing. Solar Radiation Transmission Coefficient G=0.35.
|