|
Titteluvt - Overstage Machinery - Main Hall, Dks Hall And Multiroom . Descriptionstiftelsen Unge Viken Teater Acquires Complete Overhead Machinery For The Main Hall, Dks Hall And Multiroom In Kirkegata 11, 2000 Lillestrøm. The Delivery Includes Planning, Fabrication, Delivery, Assembly, Control Systems, Cabling For Machine Functions, Adjustment, Testing, Documentation And Training. Main Hall: 14 Motorized Pulls And 3 Fixed Pulls, With Payload 300 Dan (3.00 Kn) Per Pull. Motorized Pulls Must Hold And Move Scenic Loads Over People As Independent Machine Axes With Each Load, Uc3. The Control System Must Support Cues/Scenes And Take Care Of The Main Deliverys Uc3 Use After H-09. Permitted Operating Functions Must Follow The Area Of Use Of The Connected Machinery. Dks-Saal: 12 Motor Hoists Of 500 Kg And Three Rope Frames Of 7,000 × 2,500 Mm. Multiroom: 8 Motor Hoists Of 500 Kg Each And Two Hoist Frames, 5,750 × 4,500 Mm And 5,500 × 4,500 Mm. Each Frame Is Lifted By Four Hoists As A Coordinated Group For Uc2. Raising And Lowering Takes Place With The Danger Area Blocked Off And Empty. Static Load Holding Over People Must Be Documented For The Machinerys Normal Load-Bearing System In All Halls. Options Include Higher Usage Categories, Three Additional Motorized Pulls In The Main Hall, Pantographs For Cable Routing To All Three Rope Frames In The Dks Hall And Both Rope Frames In The Multiroom, As Well As Ten Movable Cable Drum Units With 230 V Single Phase And Cat.5E To The Main Hall. Options Are Described And Priced Separately According To O-01–O-08, Including Combination Supplements O-01T And O-02T. Indicative Estimates For The Main Delivery Including Joint Services: Main Hall Nok 2,000,000, Dks Hall Nok 950,000 And Multiroom Nok 700,000; A Total Of Nok 3,650,000 Ex. Vat The Offer And Options Are Priced According To The Price Chart. One Overall Goods Contract Is Entered Into According To Ns 8407:2011 With The Adaptations In The Tender Basis. Allocation Takes Place According To Price 35%, Quality 35% And Climate And Environment - Lifespan And Resource Use 30%. The Earliest Assembly Start Is 01.02.2027. The Main Delivery And Triggered Options O-01–O-05 And O-08 Must Be Completed And Ready For Takeover No Later Than 31/03/2027. The Pantograph Options O-06 And O-07 Can Be Retrofitted And Must Be Completed No Later Than 30/06/2027. The Price Evaluation Includes P-01–P-09 + O-06 + O-07 + O-08. Complete Requirements Can Be Found In The Tender Documents Version 1.0, Dated 11/11/2026, With Requirements Response, Price Form And A20-01 Revision 01.
|