|
Construction Work – Drywall Work, Attic, Old Building, Dry Screed. Conversion And Renovation Gs Kestnerstr. Drywall Work Dg Existing And. Dry Screed: Including The Be Facility; Room-In-Room System, Room Box, One-Sided, 4 Pieces; Space Box, Two-Sided, 2Pcs; Miwo, D=150Mm, 310M²; Vapor Barrier Film, 310M²; Stud Wall Gkf, F90a, 6M; Door Opening, 8Pcs; Wall Recess, 19Pcs; Surface Q3 Walls, Ceilings, 230M²; Floor Insulation Work, Cleaning, Vapor Barrier, 770M²; Miwa, Wlg 035, D=280Mm, 590M²; Wall Insulation Board Rock Wool, 250M²; Vaulted Ceiling, F30-A From Above, Pointed Arch, Suspended, Flexible Gkf, 35M²; Vaulted Ceiling, F30-A From Above, Groin Vault, Cantilevered Ceiling, 20M²; Dry Screed, Clean, 2,845M²; Edge Insulation Strip, 2,150M; Pe Film, 0.2 Mm, 2,085M²; Expanded Clay Granules, 60 Mm, 2,845M²; Gypsum Fiberboard + Softwood Fiberboard, 2,100M²
|