Fire-Alarm System Installation Work – Br - Hazard Detection And Alarm Systems According To Din 18 382 - Award 28/2026. Announcement Ve 4-12.1 Din 18382 Electrical, Security And Information Technology Systems - Disabled Toilet Call System, Voice Alarm System (Saa), Electronic Locking System (Ess), Fire Alarm System (Bma), Burglar Alarm Systems/Hold-Up Alarm System (Ema/Üma), Escape Door Control System (Fst) Please Note That The Tender Documents Will Only Be Available To You After The Following Completed And Signed Documents Have Been Submitted: 5_Agreement Between Vs-Nfd-Ag And Vs-Nfd-An_Part 1B 6_Declaration On Secrecy_2026 7_Declaration On The Vs-Nfd Information Sheet For External Parties 02 A Federal Council Extension With A Visitor Center Will Be Built On The Property At Leipziger Straße 2 In Berlin-Mitte. The Building Is Divided Into A 5-Story Front Building And An L-Shaped, 6-Story Administration Wing. 1. Type And Scope Of Service Disabled Toilet Call System - Approx. 15 Pieces. Disabled Toilet Call Systems - Bus Connection, Central Notification/Signaling Electronic Locking System - Approx. 520 Pieces. Digital Cylinders - Approx. 75 Pieces. Wlan Access Points As Communication Hub Saa - 1X Main Control Center, 2X Sub-Control Center - Approx. 1,300 Pieces. Loudspeakers - Approx. 5 Intercom Points Bma - 1 Main Control Center, 2X Sub-Control Center - Üe, Fibs, Fsd Etc. - Point-Shaped Detectors Approx. 1,400 - Line-Shaped Detectors Approx. 8 Pieces - Ras Approx. 10 Pieces. - Approx. 700 Optical Detectors + Energy Supply Ema/Üma - 1X Ema Building, Approx. 120 Motion Detectors, 15 Hold-Up Detectors, Connection Of Approx. 2,600 Window/Door Modules Or Similar. - 2X Ema Area-Related Approx. 10 Motion Detectors, Connection Of Approx. 30 Window/Door Modules Or Similar. Escape Door Control - Approx. 45 Pieces. Escape Door Controls - Approx. 4 Pieces. Setting Up Lock Functions 2. Note Bnb Certification A Bnb Silver Certification Is Sought For The Project. The Contractor Must Contribute To The Successful Certification. The Contractor Must Comply With The Relevant Requirements Regarding Low Waste, Low Noise, Low Dust Levels As Well As The Requirements Of The Federal Soil Protection And Contaminated Site Ordinance During Construction. Compliance With The Requirements Must Be Demonstrated To The Client In The Form Of At Least Monthly Construction Site Inspection Protocols. A Sample Of The Construction Site Inspection Protocol Is Attached To The Tender Documents. Fsc Or Pefc-Coc (Chain Of Custody) Trade Certificates Must Be Provided For The Wood Products Used. 3. Execution Period: Start Of Execution: No Later Than 12 Working Days After Receipt Of The Order Letter Completion Of The Service: On January 2029, See Also Binding Individual Deadlines
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120540676
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.