|
Construction Work For School Buildings - Execution Of Works To Achieve The Objective: Building Buildings With The Function Of A High School, Sports Facilities, Dormitory, Canteen, Conference Spaces, Related Spaces, Setting Up Premises And Fencing - Gheorghe Airinei Technical College Of Posts And Telecommunications, Financed By The National Investment Program Safe And Healthy Schools. Sector 6 Of The Municipality Of Bucharest, In Order To Comply With The Local Development Strategy, The Implementation Of The Investment List And In Accordance With The Provisions Of The Financing Contract, Initiated The Public Procurement Procedure Aimed At Contracting The Works Necessary To Achieve The Investment Objective: Gheorghe Airinei Post And Telecommunications Technical College, The Design Theme Being The Construction Of Buildings In Such A Way As To Allow Classes To Be Held In The First Part Of The Day For All Students, And The Afternoon Being Dedicated To Extracurricular Activities For The Development Of Social Skills, Creativity And Sports Skills. The Specific Requirements Of The Works Were Presented In The Specification And The Technical-Economic Documentation, An Integral Part Of The Award Documentation, Published Together With The Tender Notice No. Offers. The Technical-Economic Documentation Was Revised, As Was The Procedural Documentation, According To The Clarifications Received, And This Contracting Strategy Is The Foundation Of The New Public Procurement Procedure To Be Published In Seap, Together With The Participation Notice. The Name Of The Investment Objective Entered In The Building Permit, In The Technical Project, In The Floor Plans And In Some Administrative Documents May Also Include References To The Realization Of The Connections, The Relocation Of The Transformation Station And The Location Of The Heat Pumps. For The Uniform And Comparable Preparation Of The Offers, The Contracting Authority States That: • The Final Electrical Connection, The Relocation/Supply/Equipment/Connection Of The Transformer Station And The Diversion Or Protection Works Of The Utilities Expressly Excluded By The Final Documentation Are Not The Subject Of The Contract; For The Other Connections And Connections, Including Water, Sewerage, Gas And Communications, The Inclusion, Limits And Obligations Of The Contractor Are Established Exclusively Through The Forms Final F3–F4, The Technical Draft, The Applicable Notices And The Specific Clarifications; Their Exclusion Is Not Presumed. • The Relocation, Supply, Equipment And Connection Of The Transformer Station Are Not The Subject Of This Public Procurement Procedure And Will Be Provided Separately, By The Contracting Authority; The Graphic Representations Regarding The Expressly Excluded Works Are Used Only For Information, Coordination And The Delimitation Of Technical Interfaces. • Heat Pumps And Vrf Systems Are Part Of The Technical Installation Solution And Will Be Supplied, Assembled, Connected, Tested And Commissioned In Accordance With The Technical Design, Technical Sheets And Final Forms F3–F4; • Indoor Networks And Installations, As Well As Networks From The Premises To The Points Of
|