Ventilation And Air-Conditioning Installation Work – Air Conditioning Systems - Gnue New Construction Of A Laboratory And Administration Building For The State Office For Consumer Protection Halle, An Der Fliederwegkaserne 20, 06130 Halle (Saale) (Slb-2026-0446). Air Conditioning Systems 1 Piece Of Rlt Device (Wrg, Heating, Air Filtering), 9,300 ³/H 4 Pieces Of Rlt Device (Wrg, Heating, Cooling, Air Filtration), Up To 19,500 M³/H 2 Pieces Of Rlt Device (Wrg, Heating, Cooling, Air Filtration), Up To 6,200 M³/H 1 Piece Of Rlt Device (Wrg, Heating, Cooling, Humidification/Dehumidification Air Filtering), 2,800 M³/H 1 Pc. El. Steam Humidifier, 20 Kg/H 16 Pcs. Decentralized Fans, Up To 4,000 M3/H 6 Pcs. Duct Air Filters, H14 Approx. 6,200 M² Rectangular Duct And Molded Parts, Galvanized Sheet Steel Approx. 1,730 M² Rectangular Duct And Molded Parts Made Of Plastic (Pps) Approx. 2,480 M Round Air Ducts, Steel, Galvanized And Molded Parts (Dn 74 - 400) Approx. 960 M Of Round Air Ducts And Fittings Made Of Plastic (Pps, Dn 75-315) Approx. 530 M Of Round Air Ducts And Fittings Made Of Stainless Steel (Dn 75-250) 405 Pieces Of Fire Dampers (Round, Square) With Spring Return Drive 577 Pieces Of Variable And Constant Air Volume Flow Controllers, Including Laboratory Air Control 680 Pieces. Supply And Exhaust Air Outlets 64 Pieces. Textile Air Outlets Refrigeration Systems 1 Piece. Compression Refrigeration Machine, Water-Cooled, 465 Kw (Indoor Installation) 2 Pieces 420 Kw 136 Pcs. Fan Coil Units (Only Cooling Or Heating/Cooling) Approx. 4,100 M Steel Pipe, Stainless Steel, Press Connection (Od 18 To Dn 76.1 Mm) Approx. 1,000 M Steel Pipe, Black, Welded Connection (Od 88.9 To 159 Mm) 770 Pcs. Shut-Off Valves Dn 15 To Dn 150 4 Pieces Of Cold Cells In Sandwich Construction, Including Refrigeration Equipment Without A Construction Schedule, Are Expressly Agreed As Contract Deadlines: February 8Th, 2027 - Start Of Factory And Assembly Planning May 20Th, 2027 - Start Of Construction Site Assembly
|