|
Switching Station Installation Work – Building Automation (Kg 480). The Museum Of Hamburg History At Holstenwall 24 In Hamburg Was Built Between 1914 And 1922 And Is A Listed Building. As Part Of The Current Construction Project, The Exhibition Areas Are Being Fundamentally Renovated And Restructured, As Well As The Technical Building Equipment Being Renewed. The Building Includes The Following Main Uses: Lower Ground Floor: Functional And Storage Areas, Workshops, Restoration Rooms, Office Space, Depots, Kitchen And Technical Areas (Heating/Cooling, Air Conditioning, Plumbing, Electrical). // Ground Floor: Areas For Special And Temporary Exhibitions, Gastronomy With Kitchen, Foyer, Shop And Event Area.//1. And 2Nd Floor: Areas For Exhibitions And Administration Rooms. Attic: Further Exhibition Areas, Administrative Areas, Storage And Workshop Rooms. The Construction Takes Place Over Two Construction Phases, Which Are Divided As Follows: Exhibition - This Includes The Basement Floor, Exhibition Rooms And The Attic. // Administration - These Are The Offices And The Foyer, These Are Divided Into The Left And Right Of The Building Structure. The Museum Of Hamburg History Is Receiving A Redesign Of Its Exhibition Rooms. As Part Of This, The Technical Building Equipment Including The Building Automation Will Be Completely Renewed. As Part Of The Construction Project, A New Building Automation System Is To Be Set Up To Control And Monitor The Trades: Plumbing, Heating, Cooling, Ventilation And Electrical. Bacnet Ip Must Be Used As The Communication Standard. The Building Automation For The Mhg Should Be Monitored Via A Control Computer, Which Is Located In The Building And Should Have Different Access Levels. Depending On The Users Level Of Knowledge And Knowledge, Systems Can Only Be Viewed, Setpoints And Time Switching Programs Can Be Adjusted/Changed Or Your Own Adjustments Can Be Made To The Programming. The Building Automation Measure Includes Setting Up Your Own Ga Network For Exchanging Information, Providing And Installing The Field Devices (Except Water-Side Installation, E.G. On The Heating Distributor), Laying Ga Cables, Assembling And Setting Up Ga Control Cabinets And Floor Distributors, Programming, Creating System Images, Setting Up The Control Computer, Forwarding Alarm Messages, As Well As Commissioning, User Instruction And Documentation. The Execution Is Carried Out In Close Coordination With The Tga Trades Involved And The Building Construction Department. Coordination Services Are Part Of The Advertised Services. For The Mhg, Three Ga Control Cabinets (Automation Focal Points, Asps) Are Planned In The Basement For Monitoring And Regulating The Drinking Water Supply, The Heating System, The Cooling Systems, The Ventilation Systems (These Have Their Own Control, Which Is Connected To The Ga) And The Electrical Systems, E.G. E.G.: Casambi Lighting, Security Lighting And Fire Alarm System. From E
|