Engineering Services – Uhv Großer Graben - Planning Services Goldbach M2 And M5. Lot 1 - Sub-Measure M2 - Removal Of An Existing Bed Collapse Goal: Restoration Of Ecological Continuity - The Service Phases 1-4 Have Already Been Carried Out As Part Of Previous Measures The Hornhäuser Goldbach Is A Small Second-Order River With A Catchment Area Of A Total Of 25.27 Km² At The Level Of The Mouth Of The Heinrich-Schwarz-Graben. The Body Of Water And Its Catchment Area Are Entirely Attributable To The Town Of Oschersleben (Bode), Which Belongs To The Börde District (Administrative Headquarters: District Town Haldensleben) In Saxony-Anhalt. Hgnberatunggesellschaft Mbh Was Commissioned To Plan The Revitalization Of The Hornhäuser Goldbach. The Approval Planning Is Available (See Annex C.2.Los 1_Genehmigungsplanung_Goldbach_M2-Fall). The Objective According To The Ec Water Framework Directive (Ec Wfd) /1/ Provides For The Creation Of At Least A Good Ecological Status Of The Water Body. In Order To Achieve This Goal, The Existing Bottom Drop South Of The Town Of Neindorf Is To Be Dismantled And This Area Is To Be Redesigned Ecologically. In Addition, Further Revitalization Is Planned As Part Of The Establishment Of Waterfront Strips In Conjunction With The Initiation Of Dynamic Developments Through The Installation Of Dead Wood And Bottom Substrate As Well As The Planting Of Trees Typical Of The Location. For The Aforementioned Measure (Referred To As Measure 2/M2), It Was Possible To Set The Course In Advance For The Mandatory Availability Of Space. The Water Law Permit Is Already Available. The Subject Of This Award Is The Planning Services Of Service Phases 5 To 8 In Accordance With Section 43 Hoai, Taking Into Account The Regulations Of The Water Framework Directive (Wfd). Any Necessary Survey Work Must Be Carried Out By The Contractor. Lot 2 - Sub-Measure M5 - Dismantling Of Existing Concrete Slabs In The Water Area Goal: Restoration Of Ecological Continuity - Creation Of A Low-Water Channel - Creation Of An Adjacent Maintenance Berm - The Planning Is In Place Up To The Draft Planning. The Subject Of This Award Is The Planning Services Of Service Phases 4 To 8 According To § 43 Hoai, Taking Into Account The Regulations Of The Water Framework Directive (Wfd). Any Necessary Survey Work Must Be Carried Out By The Contractor.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120539761
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.