Painting Work – 0057 - Memmingen Clinic, New Clinic Building - Painting And Varnishing Work. Memmingen Clinic Preparatory Measures: Walls Concrete Preparation 450 M² Surface Filling Gypsum Filler On Reinforced Concrete Wall 3,710 M² Walls Gk Preparation 13,320 M² Glass Fleece On Gk Walls 13,320 M² Surface Filling Gypsum Filler On Cement Plaster 2,890 M² Ceiling Concrete Preparation 16,850 M² Ceiling Plasterboard Preparation 36,250 M² Surface Filling Gypsum Filler On Reinforced Concrete Ceiling 1,250 M² Supports Concrete Preparation 3335 M² Surface Filling Gypsum Filler On Reinforced Concrete Supports 185 M² Cleaning Subsurface Steel Frames Before Painting Work 9,350 Running Meters Cleaning Subsurface Metal Surfaces Before Painting Work 2,300 M² Cleaning Ventilation Ducts And Sprinkler Pipes Before Painting Work 300 Running Meters Of Painting And Wallpapering Work Inside: First Coating, Walls, Inside, 2-Component Paint, Na1 10,100 M² First Coating, Walls, Inside, Latex Paint, Na2 66,000 M² First Coating, Walls, Inside, Emulsion Paint, Na3 31,000 M² Silicate Glaze Transparent Exposed Concrete, Walls 450 M² First Coating, Ceiling, Inside, 2K Paint, Na1 2,440 M² First Coating, Ceiling, Inside, Latex Paint, Na2 23,510 M² First Coating, Ceiling, Inside, Emulsion Paint, Na3 13,400 M² Elastic Joint, F90 1,500 Running M Joint Acrylic Can Be Painted Over B = 5-10 Mm 33,000 Running M Joint Silicone B = 5 Mm 7,200 M² Initial Coating Of Supports, Transparent Glaze 3,350 M² Painting Work Inside: Coating, Steel Surrounding Frames With Paint 9,315 M² Subsequent Plastering Of Door Frames 1,000 M² Blackout Roller Blind Inspection Cover 350-9230X175 Mm 45 M² Coating Steel Stairs 1,420 M² Coating Wall Hydrant Cabinets 86 Pieces Coating Heating Distributor 6 Pieces Painting Of The Ventilation Ducts 300 Running Meters District Hospital Construction Site Equipment Preparatory Measures: Walls Concrete Preparation 1060 M² Surface Filling Gypsum Filler On Reinforced Concrete Wall 1030 M² Walls Gk Preparation 18,400 M² Glass Fleece On Gk Walls 18,400 M² Surface Filling Gypsum Filler On Cement Plaster 405 M² Ceiling Concrete Preparation 1,025 M² Ceiling Plasterboard Preparation 3,110 M² Surface Filling Gypsum Filler On Reinforced Concrete Ceiling 120 M² Supports Concrete Preparation 3335 M² Surface Filling Gypsum Filler On Reinforced Concrete Supports 150 M² Cleaning Substrate Steel Frames Before Painting Work 2,650 Running Meters Cleaning Underground Metal Surfaces Before Painting Work 2.30 M² Painting And Wallpapering Work Inside: First Coating, Walls, Inside, 2 K Paint, Na1 10,100 M² First Coating, Walls, Inside, Latex Paint, Na2 6,000 M² First Coating, Walls, Inside, Emulsion Paint, Na3 7,300 M³ Silicate Glaze Transparent Exposed Concrete, Walls 35 M² First Coating, Ceiling, Inside, 2-Component Paint, Na1 285 M² First Coating, Ceiling, Inside, Latex Paint, Na2 2,800 M² First Coating, Ceiling, Inside, Emulsion Paint, Na3 530 M² Elastic Joint, F90 65 Running M Joint Acrylic, Paintable B=5-10 Mm 9,900 Running M Joint Silicone B=5Mm 2,200 Running M Painting Work Inside: Coating, Steel Surrounding Frames With Paint 2,650 Running Meters Subsequent Plastering Of Door Frames 200 Running Meters Coating Of Steel Stairs 160 M² Coating Of Wall Hydrants
|