Court Building Construction Work – 26E Air Conditioning Systems. - 1 Central Air Conditioning Unit For Supply And Exhaust Air, Volume Flow Approx. 5,450 M³/H, With Heat Recovery, Preheating, Cooling, Reheating, Filtration, Ec Fans And Connection To Device Automation - 1 Decentralized Supply And Exhaust Air Unit With Heat Recovery For Individual Room Ventilation In Ba Ii, Air Volume Flow Approx. 15 To 97 M³/H, With Humidity Control - Approx. 260 Linear Meters Of Spiral Folded Pipes Made Of Galvanized Sheet Steel, Dn 100 To Dn 200, Including Associated Fittings, Connecting And Fastening Parts - Approx. 52 Linear Meters Of Flexible Air Ducts Dn 100 To Dn 200 For Technically Required Connection Areas - Approx. 323 M² Of Rectangular Air Ducts Made Of Galvanized Sheet Steel And Approx. 281 M² Associated Fittings - Extensive Suspension, Support, Support And Special Constructions For Air Ducts And System Parts Including Profile And Mounting Rails - Approx. 110 Pieces Of Constant Volume Flow Controllers/Limiters As Well As 4 Pieces Of Variable Volume Flow Controllers With Electrical Control - 22 Pieces Of Ei 90 S Fire Dampers In Round And Rectangular Versions Including Electric Drives, End Position Monitoring And Necessary Connection Work - Approx. 112 Pieces Of Round And Baffle Silencer To Limit The Transmission Of Air And Structure-Borne Noise - 52 Pieces Of Supply And Exhaust Air Valves As Well As 65 Pieces Of Supply And Exhaust Air Grilles Including Installation Frame And Volume Flow Adjustment - 1 Piece Of Weather Protection Grille For Outside Air And 1 Piece Of Deflector Hood With Flat Roof Base For Exhaust Air - 2 Pieces Of Smoke Trigger Devices For Air Ducts Including Monitoring And Functional Testing - Approx. 70 Pieces Of Wall/Ceiling Ducts With Non-Combustible Mineral Wool And The Necessary Ones Fire Protection Joint Seals In The Area Of The Fire Dampers - Approx. 27 Core Drillings In Concrete, As Well As Measurement, Marking And Cutting Work For Bushings - Air Volume Measurement And Adjustment Of The Entire System Including Target/Actual Comparison And Performance Measurements - Functional, Hygiene And Acceptance Tests Including Dust Density Measurement, As Well As Participation In Ventilation And Fire Protection Damper Acceptance - Participation In The Commissioning Of The Electrical, Msr And... Building Automation Including Testing Of Interfaces And Data Point Functions - Instruction Of Operating Personnel, System Identification, System Diagrams, Inventory And Revision Documents As Well As Technical Documentation.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120518421
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.