Snow-Clearing Services – Ir.Zp.271.32.2026 Winter Maintenance Of Municipal Roads In The Siołkowa Village. I. The Subject Of The Order Is To Maintain Passability Of Municipal Roads In The Siołkowa Commune In Accordance With The Adopted Standards By Clearing Snow From The Road, Combating Winter Slipperiness Using Our Own Roughening Material, And Clearing Roads In The Event Of Snowdrifts On The Roads Of The Grybów Commune, In An Estimated Time Of 210 Hours. Ii. 1. Contractors Who Are Not Subject To Exclusion Under The Terms Set Out In Chapter Ix Of The Swz And Who Meet The Conditions For Participation In The Procedure Specified By The Ordering Party May Apply For The Award Of The Contract. 2. Contractors Who Meet The Conditions Regarding: 1) Ability To Enter Into Business Transactions May Apply For The Award Of The Contract: The Ordering Party Does Not Impose Any Condition In The Above Respect. 2) Authorizations To Conduct Specific Business Or Professional Activities, Provided That This Results From Separate Regulations: The Ordering Party Does Not Impose Any Condition In The Above Scope. 3) Economic Or Financial Situation: The Ordering Party Does Not Impose Any Conditions In The Above Respect. 4) Technical Or Professional Capacity, For Each Part Separately: The Contractor Will Meet The Condition If He Proves That He Has At Least Two Vehicles Approved For Traffic On A Wheeled Chassis, With Mechanical Power And Equipment Adapted To Clearing Snow From Roads, I.E. Two Vehicles (E.G. Agricultural Tractor, Backhoe Loader Equipment With A Power Of At Least 40 Kw With A Drive On Two Axles, Equipped With A Single-Sided Blade Plow With A Rubber Pad) And Two Spreaders For Sprinkling Roughening Material. The Spreader For Sprinkling Roughening Material Can Be Mounted On A Delivery Van Or Truck. /It Is Not Allowed To Clear Snow Using The Universal Front Bucket Of Backhoe-Dozers Or Agricultural Tractors And A Plow Mounted At The Rear Of The Vehicle, The So-Called Sweepers/. 3. With Respect To Contractors Jointly Applying For The Award Of A Contract, The Ordering Party Allows Joint Fulfillment Of The Condition Regarding Technical Or Professional Capacity. 4. The Ordering Party May, At Any Stage Of The Procedure, Consider That The Contractor Does Not Have The Required Capabilities If The Involvement Of His Technical Or Professional Resources In Other Business Ventures May Have A Negative Impact On The Implementation Of The Contract (Article 116(2) Of The Public Procurement Law). Iii. 1. The Contractor Is Excluded From The Contract Award Procedure, 1) In Relation To Which At Least One Of The Circumstances Specified In Art. 108 Section 1 Pzp; 2. The Exclusion Of The Contractor In The Circumstances Indicated In Point 1 Takes Place: 1) In The Cases Referred To In Art. 108 Section 1 Point 1 Letter A-G And Point 2 Of The Pzp, For A Period Of 5 Years From The Date On Which The Judgment Confirming The Existence Of One Of The Grounds For Exclusion Becomes Final, Unless The Judgment Specifies A Different Period Of Exclusion; 2) In The Cases Referred To In: A) Art. 108 Section 1 Point 1 Letter H And Point 2 Of The Pzp, When The Person Referred To In These Provisions Has Been Convicted Of An Offense Specified In Art. 108 Section 1 Point 1 Letter H Pzp, 3) In The Case Referred To In A
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120516832
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.