1) Part 1 - Construction Of Street Lighting At Al. Belwender Stage Ii. The Order Was Divided Into 2 Stages. Stage 1: • Execution Of Earthworks Consisting Of Field Drilling Along With The Development Of Foundations For Pole Stands And Inserting A Cable Line Into The Drillings, I.E. • Laying A Cable Weighing Up To 1.0 Kg/M In Cable Trenches Next To The Active Road On A Section Of Approximately 170 M (26-130 Units/H); • Mechanical Drilling For A Pipe With Wed. Up To 125 Mm Under Objects Next To The Active Road On A Section Of Approximately 170 M;• Construction Of 3 Pcs. Of Footings Up To 1.5 M Deep In Category Iv Soil, Including Backfilling For Electricity Poles;• Prefabricated Footings Weighing 0.5 To 0.8 T;• Laying Earth Electrodes In Cable Trenches On A Section Of Approximately 170 M. Stage 2: • Assembly And Erection Of 20 Pcs. Of Lighting Poles Weighing Up To 300 Kg (Assembly To 17 Pcs. Of Foundation Footings Already Made);• Installation Of 20 Pcs. Of External Lighting Fixtures On A Boom;• Level Of Grounding Resistance Of The Power Line Pole On 20 Poles;• Measurement Of A 4-Wire Cable Line On 20 Poles;• Installation Of Tubular Booms Weighing Up To 15 Kg On 20 Poles.2. Scope Of The Order - Applies To All Parts 1) The Ordering Party Requires That All Materials And Devices Used By The Contractor To Implement The Subject Of The Order Are Brand New And Have Approvals, Certificates And Certificates Of Approval For Use In Poland. The Technical Parameters Of The Devices Planned To Be Installed, The Selected Colors And The Type Of Materials Should Be Agreed With The Ordering Party Before Use.2) The Contractor Is Also Obliged To: A) Prepare And Submit To The Ordering Party, Within 7 Days From The Date Of Signing The Contract, A Cost Estimate Prepared Using The Simplified Calculation Method, Divided Into Individual Elements Of The Order. This Cost Estimate Will Be Used To Calculate The Contractors Remuneration Due In The Event Of Withdrawal From The Contract And Settlement Of The Works. A) Providing Geodetic Services To The Extent Necessary To Perform The Task, Such As: Staking, Ongoing Service During The Investment Implementation And Carrying Out An As-Built Geodetic Inventory With The Results Transferred To Geodetic Resources; B) Commissioning Specialist Units To Supervise The Existing Infrastructure In The Areas Of Collisions And Implement Any Additional Security Measures Recommended By The Owners Or Users Of Utilities;C) Preparing A Traffic Organization Project For The Duration Of The Works, Obtaining The Required Approvals, And Implementing, Based On This Project, Changing The Signage For The Period Of The Works; D) Developing The Necessary Conditions Or Arrangements For The Performance Of The Works; E) Ensuring, At Its Own Expense And Through Its Own Efforts, The Utilities Necessary To Complete The Order, F) Securing The Works In Accordance With Occupational Health And Safety Regulations, G) Implementing And Maintaining Security Of The Works And The
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120505106
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.