The Subject Of The Order Is The Comprehensive Execution Of Construction Works As Part Of The Following Tasks: Task No. 1 Entitled Reconstruction Of The Sports Pitch In Gogołowice, Which Includes, Among Others: 1) Construction Of A Two-Layer Polyurethane Surface With An Area Of 450 M2, On The Existing Asphalt Pitch (Thickness 6 Cm), 2) Delivery And Installation Of Small Architectural Elements, Including: Regulations For The Use Of The Facility,3) Delivery And Installation Of A Fence Made Of Galvanized, Coated Mesh 50X50x3.8 Mm, Green, Along The Longer Sides Of The Pitch, 2.4 M High, Along With Entrance Gates With Dimensions. 1.0 X 2.4 M, Length 60 M,4) Delivery And Installation Of Ball Catches With A Height Of 4.0 M And A Length Of 30 M Along The Short Sides,5) Delivery And Assembly Of Pitch Equipment, I.E. Basketball Stands, Volleyball And Tennis Posts, Handball Goals, System Sleeves For Mounting The Posts Along With Covers To Cover The Polyurethane-Coated Sleeves, Covers Protective Covers For Basketball Posts And Stands. Task No. 2 Entitled Reconstruction Of The Playground In Gogołowice, Which Includes The Following: 1) Disassembly And Disposal Of Used Equipment. 2) Delivery And Assembly Of New Small Architecture Objects, Including: A) Steel And Wooden Benches - 4 Pieces, B) Steel Waste Bins - 3 Pieces, C) Bail Bicycle Racks (4 Pipes), 3) Delivery And Assembly Of New Playground Equipment, Including: A) Set With Two Slides - 1 Set, B) Swing Swing Nest - 1 Set, C) Square Sandbox 3X3 M - 1 Set, D) Clover Rocker - 1 Piece, E) Alpaca Rocker - 1 Piece, 4) Disassembly And Reassembly Of Existing Recreational Equipment To A New Location, I.E.: A) Set With A Slide - 1 Pc., B) Double Swing Swing - 1 Pc., C) Hourglass Rope, D) Double Scale Swing, E) Disc Carousel, F) Tic-Tac-Toe Board, 5) Disassembly And Reassembly Of Street Furniture Elements, I.E.: A) Board With Playground Regulations - 1 Pc., B) Concrete And Wooden Bench - 1 Pc., C) Steel And Wooden Benches - 1 Pc., D) Steel Waste Bin - 1 Pc. 6) Construction Of Landscaping Elements, I.E.: A) Sand Field With An Area Of 264 M2 - Safe Surface, B) Concrete Paving Stones With An Area Of 25.3 M2, C) Fences 1.2 M High, 88 M Long, D) Fences High. 1.7 M With A Length Of 80 Meters. A Detailed Description Of The Subject Of The Order Is Provided By The Technical Documentation Provided In The Swz, In Particular The Construction Design And Technical Design, Technical Specifications And Separate Bills Of Quantities For Each Task. The Required Features Of The Construction Works Were Specified By The Ordering Party In The Above-Mentioned. Documents.1.1. The Ordering Party Informs That It Is Applying For Funding From The European Agricultural Fund For Rural Development, Therefore The Contractor Is Obliged To Meet The Deadline For Completing The Task Specified In The Swz. For This Purpose, The Contractor Is Obliged To Include In The Price Of The Offer The Performance Of Works Under The Extended Working Time System, Ensur
|