The Subject Of The Order Is The Execution Of The Task Entitled: Renovation And Reconstruction Of Municipal Roads In The Village Of Polkowo In The Sztabina Commune, I.E.: 1) Renovation Of The Section Of Municipal Road No. 102822B Dębowo - Polkowo - Augustowski Canal, 730 M Long - Road Through The Village Of Polkowo Under The Government Road Development Fund. 2) Reconstruction Of The Section Of Municipal Road No. 167517B, 320 M Long.2.Description Of The Subject Of The Order.1) Scope Of Works For The Renovation Of Road No. 102822B In The Month. Polkowo Is Included In The Bill Of Quantities - Which Is An Element Of The Technical Documentation - Annex No. 5 To The Swz. There Is No Design Documentation Prepared For The Road Renovation. The Beginning Of The Designed Section Is Located Near The Bus Stop, And The End Of The Renovated Section Is At The End Of The Village Buildings. The Documentation Is Accompanied By A Drawing Showing The Scope Of Road Renovation. The Scope Of Works Will Include: - Renovation Of The Existing Bituminous Surface By Constructing A New Asphalt Concrete Surface On A Section Of Approximately 730 M In Length And 4 M In Width (The Same As Before), - Renovation Of The Existing Dirt Roadsides, 0.75 M Wide, - Construction And Installation Of An Information Board With Dimensions 180 Cm X 120 Cm Regarding The Implementation Of Investments Under The Government Road Development Fund According To The Applicable Formula. 2) Detailed Scope Of Reconstruction Of Road No. 167517B In The Month. Polkowo Is Included In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works - Constituting Annex No. 5 To The Swz. The Bill Of Quantities Attached To The Swz Is Of An Auxiliary Nature. The Contractor Is Obliged To Carefully Check The Actual Number Of Works Against The Design Documentation. The Main Elements Of The Works Planned To Be Performed Are Presented Below: - Technical And Operational Requirements Of The Road: Class D - Traffic Category Kr1 - Single Carriageway Road, With One Lane For Traffic In Both Directions, - Basic Road Width - 3.5 M; - Substructure Made Of Natural Aggregate And A Leveling Layer Of Thickness 15 Cm - Shoulders Made Of Natural Aggregate, 0.75 M Wide. Due To The Fact That The Contract For Construction Works Will Be A Lump Sum Contract, In The Event Of A Larger Number Of Works In Any Bill Of Quantities Item During The Works, It Cannot Be Considered Additional Works With A Request For Additional Remuneration. Any Lack Of Necessary Works Resulting From The Design Documentation In The Bill Of Quantities Does Not Release The Contractor From The Obligation To Perform Them Based On The Design At The Contract Price.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120448477
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.