|
1. The Subject Of The Order Is: Development Of Design Documentation And Authors Supervision For The Investment Titled Construction Works Aimed At Changing The Purpose Of The Cryochamber Room Along With Changing The Use To An Exercise Room In A Property In Kołobrzeg, Currently, There Is A Cryochamber In Room A2-1.11. The Documentation Should Include Its Dismantling And Disposal, As Well As The Creation Of A Large Room For Collective Exercises. Before Starting Design Work, A Site Visit Is Required In The Presence Of The Facility User In Order To: • Perform Detailed Measurements Of The Rooms, • Identify Possible Installation Conflicts And Construction Limitations, • Determine The Scope Of Disassembly And Accompanying Works, • Determine The Method Of Physical Liquidation Of The Cryochamber Device, • Assess The Availability And Logistic Conditions For Carrying Out The Works (Access, Transport Of Materials, Storage Areas), • Agree On Preliminary Solutions Functional And Material, Including Colors And Finishing Standard, • Confirmation Of Compliance Of The Planned Works With The Users Needs And Safety And Regulatory Requirements, • Verification Whether There Are Any Installations In The Walls (E.G. Heating Pipes, Water And Sewage Pipes, Etc.)2.Scope Of Documentation: 1) Disassembly And Disposal Of The Cryochamber* (Determination Of Detailed Requirements Regarding The Disassembly And Disposal Of The Medical Device), 2) Demolition Of Partition Walls Between The Indicated Rooms, 3) Possible Strengthening Of The Ceiling Or Construction Of Additional Pillars, 4) Filling Of Transition Holes For Installations In The Floor, 5) Making A New Self-Leveling Screed If Necessary, 6) Laying A Rubberized Floor Covering (High Shock Absorption, Anti-Slip Properties, Resistance To Wear, Easy Hygiene Maintenance - To Be Agreed With The User And The Ordering Party At The Design Stage)7) Painting Walls, 8) Painting The Ceiling,9) Installing Doors, Ladders, Mirrors, Handrails,10) Replacing Windows And Window Sills,11) Arranging New Lighting,12) Verifying Existing Floor Levels Between Rooms And, In Case Of Differences, Cutting Off Floors And Laying New Ones,13) Plastering Ceilings And Filling Or Installing The Ceiling Suspended,14) Adaptation Of The Emergency Lighting System To The New Arrangement Of Space,15) Installation Of Air Conditioning,16) Disconnection Of The Cables Supplying The Cryocormorum From The Switchboard, Removal Of Existing Power Lines,17) Adaptation Of The Mechanical Ventilation System To The New Arrangement Of Rooms.18) Possible Relocation Of Heating, Sewage And Other Necessary Installations.* The Cryotherapy Chamber As A Complete Apparatus For Systemic Cryotherapy Consists Of: The Treatment Part In The Form Of A Three-Chamber Module Placed On A Thermal Insulation Mat In Room A2.1.11, And A Technical Part Including A Compressor Refrigeration System (Cascade Of Three Compressors), Computer Control And Power Supply Module Located In The Basement Of Building
|