|
Electrical Installation Work – Ecological Transition Program - State Of Geneva - Co Drize - Call For Tenders Consortium Of Companies And Agents. As Part Of Its Ecological Transition Program, The Territorial Department, And More Particularly The Cantonal Buildings Office (Also Referred To Hereinafter As Ocba), Is Developing Several Operations To Transform Cantonal Buildings. The Co Drize Project Concerns The Complete Renovation Of The Interior And Exterior Lighting Installations Of The Building Located Route De Drize 8 In Carouge. The Sia 31 Phase Studies, Carried Out By Ad Engineering, The Clients Electrical Engineer Representative, Focused On The Condition Of Existing Installations, Identification Of Lighting Fixtures, Lighting Levels, Power Balances, Replacement Principles, Regulation And Adaptation Of Existing Automation. The End Of Phase 31 File Was Accepted By The Client And Serves As A Basis For The Development Of Sia Phase 32 (See “4 Electrical Engineer – End Of Phase Report 31)). The Chosen Solution Provides For The Replacement Of Approximately 2,855 Out Of 2,873 Existing Lighting Fixtures, Mainly Fluorescent And Halogen, With Led Lighting Fixtures. The Project Integrates Dali Regulation, The Addition Or Adaptation Of Detectors And The Reprogramming Of The Existing Knx Installation. The Principle Sought Is To Preserve As Much As Possible The Existing Infrastructure – Circuits, Frameworks And False Ceilings – While Making The Necessary Adaptations For A Compliant, Usable And Maintainable Structure. The Technical Documents Had Initially Been Prepared For Separate Tenders By Trade. The Ocba Decided To Entrust The Entire Operation To A Consortium Of Agents And Companies, The Sole Contact Responsible For The Complete Implementation. The Work To Be Carried Out During The Drize Orientation Cycle (Hereinafter Also Referred To As The Project Or The Contract), Which Is The Subject Of This Call For Tenders, Is As Follows: · Completion Of Phase 32 Studies (Work Project); · Site Installations, Protections, Means Of Access And Interventions At Height; · Removal Of Existing Lighting Fixtures, Supply, Installation And Adjustment Of New Led Chandeliers; · Electrical Installations, Emergency Lighting, Itto Controls And Adaptations To Existing Distributions; · Building Automation, Adaptation/Reprogramming Knx, Dali, Detection And Variation Depending On The Supply Of Natural Light; · Related Work, Sanitation, False Ceilings, Plastering, Painting, Repairs And Cleaning; · Coordination Of A Construction Site In A Partially Occupied School Establishment, Carried Out In Phases And Over Several Years – The Work Taking Place Mainly During The School Holiday Period.
|