|
Office Block Construction Work – Construction Of The Commune Office Building In Suchy Las. 1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Construction Of The Building Of The Commune Office In Suchy Las At Ul. Szkolna In Suchy Las, On Plot No. 533/6, Including The Demolition Of The Existing Building Of The Commune Office, Technical Infrastructure And Land Development, As Well As The Comprehensive Relocation Of The Office To The New Building. 2. The Investment Will Be Implemented On The Basis Of: 1) Construction Design Approved By Decision No. 1471/24 Of May 17, 2024 - Permit For The Demolition Of The Building; 2) Construction Design Approved By Decision No. 2370/24 Of July 31, 2024 - Permit For The Construction Of A New Headquarters Of The Suchy Las Commune Office Together With The Construction Of Pedestrian And Pedestrian Routes, Squares, Parking Spaces, A Fountain, A Retaining Wall, A Retention Tank For Rainwater, A Shelter For Smokers And Flagpoles; 3) Technical Design: The Designs Were Prepared By The Abk – Projekt Design Unit, Ul. Lisowskiego 2/4, 65-072 Zielona Góra. Prepared By The Abk – Projekt Design Unit, Ul. Lisowskiego 2/4, 65-072 Zielona Góra. 3. The Scope Of The Order Includes In Particular: 1) Construction Of An Administrative Building Consisting Of Two Segments: (1) Three-Story, Partly With A Basement, And (2) Single-Story, Without A Basement; 2) Construction Of External Installations: Water Supply, Sanitary Sewage System (Network And Connection), Storm Sewage System With A Tight Retention Tank, Installation For Watering The Area, Gas Installation, Power Supply Line And Area Lighting; 3) Development Of The Area: Squares And Sidewalks, Pedestrian And Driving Routes, Parking Spaces With Access Roads, A Floor Fountain, A Retaining Wall, A Shelter For Smokers, Garbage Covers, Three Flagpoles, Space For Coat Of Arms, Small Architecture (Benches, Bicycle Racks, Park Deckchairs, Baskets, Bollards), Relocation Of Wojciech Bogusławskis Bench And Greenery - In Accordance With Design Documentation; 4) Demolition Of The Existing Building Of The Commune Office (Office Part And Warehouse Part) Along With The Demolition Of The Network And Connections And Removal Of Conflicts With The Existing Infrastructure; 5) Comprehensive Relocation Of The Commune Office To A New Building (Stage Ii); 6) Cutting Down The Trees Indicated In The Design Documentation And Caring For The Plantings For One Growing Season; 7) Obtaining, On Behalf Of The Ordering Party, A Permit To Use The Facility And Preparing As-Built Documentation. 4. Characteristic Parameters Of The Building: Volume 10,524.70 M³; Usable Area 3,659.30 M²; Total Area 4,241.21 M²; Building Area 1,578.06 M²; Building Height 11.75 M (To The Ridge), 11.92 M (To The Attic Wall); Length 85.47 M; Width 42.71 M; Number Of Floors: 3 Above Ground And 1 Underground. 5. Phased Implementation: 1) Stage I - Demolition Of The Skate Park Surface And Disassembly Of Its Elements With Their Transport To The Location Indicated By The Ordering Party In The Suchy Las Commune, Construction Of A Three-Story Administrative Building
|