Engineering Design Services – Planning Services Hls - Gi And Expansion. Technical Equipment, System Groups 1, 2, 3 And 8 In Accordance With §§ 53 Ff. Hoai, Lph 2-9 For General Repairs And Expansion Into An All-Day, 5-Class Elementary School With A Double Sports Hall, Cafeteria, Thv Apartment, House For Children 2-4-0 And Outdoor Play Areas On Hirschbergstr. 33, 80634 Munich, 9Th District, Munich Neuhausen-Nymphenburg. The Building Consists Of A Ground Floor On The Mezzanine Floor, Three Upper Floors, An Undeveloped Attic And A Basement In The Basement With Technical And Ancillary Rooms. On The Ground Floor Of The Western Wing Of The Building Facing Renatastrasse There Is A Daycare Center With 4 Kiga Groups And 2 After-School Groups. For The Duration Of The General Repair And Expansion. The Daycare Center Is To Be Relocated To Another Location, The 2 After-School Groups Are To Be Part Of The All-Day Offer At The Primary School At The Hirschbergstr. 33 Are Looked After. The School Is Currently Organized Into 4 Classes And Housed In A Classic Hallway-Type Floor Plan. The School Also Has A Thv Apartment And An Auditorium On The Ground Floor. There Is A Sports Hall On The First And Second Floors. In The Inner Courtyard Of The School There Are The Break Areas For The Primary School, An All-Weather Pitch Approx. 40M X 70M, A Grass Playing Field Approx. 50M X 22M, A Running Track And An Outdoor Play Area For The Daycare Center. There Are Currently 10 Parking Spaces For The Primary School On Its Own Property, Which Are Accessible From Sedlmayrstrasse. The Listed School Building, Designed By Theodor Fischer, Was Built Between 1901 And 1903 In Predominantly Solid Construction. Load-Bearing Walls Were Built In Concrete And Masonry. The Floor Ceilings Were Manufactured As Solid Steel Beam Ceilings And Reinforced Concrete Ribbed Ceilings. Support Structures Were Made Of Steel. In The Hallways On The Ground Floor And First Floor, Historical False Vaults Were Arranged As Rabitz Ceilings (Suspended Wire Plaster Ceilings) Under The Floor Ceilings. In Addition To The Original Building Structure Around 1900, War-Related Reconstruction Measures, Massive Water Damage And Numerous Later Renovations And Changes Of Use Must Be Taken Into Account. In Order To Obtain An Overview Of The Building Structure And The Pollutant Situation In The Existing Building, Preliminary Structural And Pollutant Investigations Were Carried Out. The Test Results Will Be Made Available Before Planning Begins. The Existing School Is To Be Expanded From A 4-Class To A 5-Class, All-Day Elementary School, Based On The Munich Learning House Concept. A House For Children 2-4-0 Must Also Be Planned. A Feasibility Study Plans To Accommodate The Cafeteria, Double Sports Hall, Thv Apartment, Outdoor Play Area And Pv System In A New Extension. The Existing Elt And Hls Must Be Fundamentally Revised And Supplemented. The Number Of Parking Spaces Required Is In Accordance With The Citys Parking Space Regulations. Zud
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120433548
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.