The Task Is Divided Into Stages. As Part Of The First Stage, A New Outlet To The Strzegomka River Will Be Constructed Along With A Connection To The Sewage System In Ul. Piłsudskiego And Construction Of A Temporary Surface. The Scope Of The Stage Is Presented In The Land Development Project. The Task Is Co-Financed By The European Union Solidarity Fund. The Scope Of The Task Includes The Construction Of An Outlet To The Strzegomka River Along With Strengthening And Correction Of The River Slopes And Connection To The Sewage System In Ul. Piłsudskiego In Strzegom And Construction Of Surfaces, Including: 1. Demolition Of Existing Surfaces, 2.Execution Of Earthworks And Removal Of Waste To The Landfill,3.Construction Of A Retaining Wall With Sheet Piles And Correction Of Slopes, 4.Construction Of Foundation And Stabilization,5.Construction Of Surfaces From Mineral And Bituminous Mixtures, Including Sprinkling And Sealing The Layers,6.Construction Of Sidewalk And Exits,7.Planting Green Areas With Humus And Sowing A Layer Of Humus,8. Adjustment Of External Devices, 9. Construction Of A Storm Sewage System On The Section Covered By Stage 1 Of The Task, 10. Dismantling Of A Section Of The Storm Sewage System, 11. Construction Of An Outlet To The River Along With Strengthening And Correction Of The River Slopes, 12. Making A Jacking/Drilling Under The Provincial Road No. 382 - Section D2-D, Before Starting The Works, It Is Necessary To Notify The Administrator Of The Provincial Road No. 382 And The Investors Supervision Inspector On The Part Of The Investor, About Their Date, 13. Adjustment Of External Devices And Height Adjustment, Exits, Access Roads And Access Roads To The Property, Repair Immediate Removal Of Existing Equipment And Technical Infrastructure On The Road In The Event Of Damage, Protection Of Existing Technical Infrastructure Against Damage And Destruction: Water And Sewage Networks And Connections, Power Cables, Telecommunications Cables, Elimination Of Existing Collisions With Existing Technical Infrastructure, 14. Organization Of Construction Facilities (Location, Energy And Water Consumption, Supervision, Etc.), 15. Maintaining Order During The Execution Of Works And Systematic Tidying Up Of The Work Site,16. Current Removal Of Unusable Materials From The Construction Site To A Waste Landfill And Their Disposal,17. Organizing And Carrying Out The Necessary Inspections,18. Fees For Supervision Of Industry Units,19. Participation In Meetings And Conferences Designated By The Ordering Party To Discuss Matters Related To The Implementation Of The Task And During The Guarantee And Warranty Period,20 Tidying Up And Restoring The Construction Site And The Area Adjacent To The Construction Site To Its Original Condition After Completion Of All Works Covered By The Order, Including Removal Of Rubble To The Landfill And Disposal Of Construction Waste, Sowing Green Areas At The Construction Site With Grass Works, 21. Preparation Of A Safety And
|