|
The Subject Of The Order: Execution Of The Detailed Design Of Hiding Places In The Building Of The Poznań University Of Technology.1. The Subject Of The Order Is The Development Of Detailed Design Documentation In The Architectural And Construction Industry For Two U 1 Category Shelters, Intended For 299 People Each, Carried Out As Part Of The Reconstruction And Expansion Of Building A 2 Of The Faculty Of Civil Engineering And Transport Of The Poznań University Of Technology At Ul. Piotrowo 5 In Poznań, Located On Part Of Plot No. 3/2, Sheet 18, Śródka District (4), 2. The Documentation Should Be Prepared Based On The Building Permit No. 579/2026 Of August 13, 2026 And On The Basis Of The Land Development, Architecture And Structure Designs Submitted By The Ordering Party, As Well As Other Studies Made Available, Taking Into Account The Connections Of The Hiding Places With The Existing Building And The Designed Main Hall.3. Execution Of The Detailed Design For The Following Industries: Architectural Industrythe Scope Includes The Development Of Detailed Solutions For Hiding Rooms, Sanitary Facilities, Storage And Service Facilities, Vestibules, Communications As Well As Exits And Escape Tunnels, Including: • Dimensioned Projections, Cross-Sections And Construction Details; • Solutions For Partitions, Floors, Insulation And Expansion Joints; • Combinations Of Doors, Closures, Finishing And Equipment Covered By The Architectural Scope; • Solutions Ensuring Accessibility And Safe Use And Evacuation;• Details Of Connections With Existing And Designed Parts Of The Building;• Coordination Of Openings, Culverts And Technical Spaces With Installation Designs. Construction Industrythe Scope Includes The Development Of Detailed Solutions For Concealment Structures And Related Escape Routes, Including: • Calculations Supplementing And Verifying Implementation Solutions, Taking Into Account Protective Loads, Including Rubble; • Formwork And Reinforcement Drawings Of Foundation Slabs, Walls, Columns, Ceilings, Tunnels And Others Elements Covered By The Order;• Specifications Of Reinforcing Steel And Details Of Anchors, Connections, Construction Joints And Expansion Joints;• Solutions For The Foundation And Cooperation Of The Structure With The Reinforced Base;• Solutions For Openings, Culverts, Local Reinforcements And Embedding Of Equipment Elements;• Rules For The Sequence Of Implementation And Necessary Safeguards For The Existing Structure Within The Scope Of The Works Covered By The Documentation.Coordination And Completenessthe Documentation Of Both Industries Must Be Mutually Coordinated And Consistent With The Installation Solutions Provided By The Ordering Party. The Contractor Will Prepare A List Of Required Input Data From Installation Designers And Agree On The Location And Parameters Of Openings, Culverts, Loads From Devices And Other Elements Affecting The Architecture Or Structure. Before Starting To Develop Detailed Solutions, The Contractor
|