|
1. The Subject Of The Order Is The Execution By The Contractor Of Construction Works Consisting In The Reconstruction And Change Of Use Of The Rooms Of The Village Community Center Into Rehabilitation Rooms Of The Daily Home Active Senior - Asy In The Building Of The Center For Support And Activation Of The Elderly For The Inhabitants Of The Sękowa Commune On Plot No. 151 In Męcina Wielka, Building No. 89, In The Sękowa Commune. The Subject Of The Order Includes, Among Others: The Following Works: - Demolition Works: A) Tearing Up The Existing Floor And Screed With Insulating Layers (~ 17 Cm), B) Carving Out Lean Concrete (~ 10 Cm), C) Removing The Old Foundation/Soil (~ 30 Cm To The Level - 57 Cm From The Floor Level), D) Dismantling The Door With The Frame, E) Removing Loose Plasters With Priming And Filling The Gaps Plaster Mortar, - Construction Works: A) Construction Of A Base Made Of Natural Aggregate 2/31.5 Mm (Compound), Mechanically Stabilized, Thick. 25 Cm, B) Construction Of Water And Sanitary Sewage Connections, C) Construction Of Lean C12/15 Concrete, 10 Cm Thick, D) Construction Of Partition Walls From 18 Cm Thick Aerated Concrete Blocks, E) Laying A Layer Of Heavy-Duty Damp-Proof Insulation - 2 X Roofing Felt On Adhesive, F) Laying Polyethylene Foil, G) Laying A Layer Of Thermal Insulation - Pir Boards Thick. 10 Cm, H) Laying Polyethylene Foil, I) Making Cement-Sand Screed Ct 20/25 Gr. 10 Cm Reinforced With Welded Mesh Ø3 Mm, Mesh 10X10 Cm, J) Installation Of New Water And Sewage, Central Heating, Electrical And Mechanical Ventilation Installations, K) Installation Of Gypsum Plasters + Priming And 3X Painting With Latex Paints Resistant To Mold And Moisture, L) Installation Of Door Frames And Internal Doors, M) Installation Of Window Vents, N) Installation Of Stoneware Tile Floors On Adhesive Mortar, O) Tiling The Walls To A Height Of 2.0 M (Rooms 1.18 And 1.19), P) Construction Of The Frame And Ceiling Cassettes, Q) White Assembly Of Installations And Devices, Assembly Of The Stair Platform, 2.A Detailed Description Of The Subject Of The Order Is Specified In The Documentation: 1) Architectural And Construction Design - Annex No. 1 To The Swz,2) Technical Design - Annex No. 2 To The Swz,3) Executive Design - Annex No. 3 To The Swz,4) Technical Specification For The Execution And Acceptance Of Works - Annex No. 4 To The Swz.3. The Bill Of Quantities - Annex No. 5 To The Swz, Is An Auxiliary Element Of The Description Of The Subject Of The Order, Which, Due To The Lump-Sum Nature Of The Remuneration, Will Not Constitute The Basis For Settlements Between The Ordering Party And The Contractor.
|