|
Construction Work – Renovation Of An Apartment Building - Kopernikusring 1-9, 36-44 16227 Eberswalde, Germany, Window. The Services To Be Awarded Include The Replacement Of The Windows, Balcony Window/Window Door Elements And Basement Windows Identified In The Execution Documents, Including Dismantling, Disposal, Delivery, Assembly, Connection Training And Restoration Of The Affected Connection Areas. The Work Will Be Carried Out In Sections In The Predominantly Inhabited Building. Elements That Have Already Been Renewed And Are Intended To Remain Will Not Be Replaced. Preparation, Protection And Dismantling Work The Following Services Are Planned: - Window-Specific Construction Site Equipment Including Provision And Clearance, - Resident Coordination And Coordination Of Apartment Access As Well As Condition Documentation Of The Affected Window Areas, - Protection Of Apartments, Stairways And Transport Routes As Well As Basement Traffic Areas; Special Dust Protection Measures In Accordance With Lv, - Dismantling Of The Advertised Existing Windows, Balcony Window/Window Door Elements And Interior Window Sills, - Separate Collection, Removal And Disposal Of The Removed Elements And Window Sills In Accordance With Lv. Delivery And Installation Of New Window Elements - Plastic Basement Windows Of Types Kf-01 To Kf-03, Including Approx. 45 × 50 Cm And 50 × 75 Cm, - White Plastic Apartment Windows Of Types F-01 To F-03 In Different Dimensions And Pitches, - Coupled Plastic Window/Balcony Door Elements Bt-01, Approx. 2,160 × 2,160 Mm, - Manufacturing Dimensions, Technical Evidence, Delivery And Transport To The Installation Site, - Assembly Including Fittings, Fastenings, Required Coupling And Reinforcement Profiles As Well As Insulation Of The Building Connection Joints, - Airtight Internal And Driving Rain-Tight External Connection Formation As Well As Special Threshold And Connection Seals In Accordance With Lv. For The New Apartment Windows, The Lv Requires A Heat Transfer Coefficient Of The Complete Element Of Uw? 0.85 W/(M²?K), To Be Verified For The Actually Intended Element Designs And Dimensions. The Remaining Technical Requirements Result From The Lv And The Associated Implementation Planning. Ventilation Elements And Restoration Work - Installation Of Moisture-Controlled Outside Air Vents And Window Rebate Ventilators In Accordance With The Advertised Positions And The Ventilation Planning, - Delivery And Installation Of White Interior Window Sills With Straight Molded Edges And End Caps, Depth Up To 20 Cm, - Restoration Of The Inner Window And Cellar Window Reveals As Well As The Affected Plastering And Connection Areas, - Painterly Restoration Of The Inner Reveal And Connection Areas In Accordance With Lv. Tests And Documentation - Adjustment And Functional Testing Of The Installed Elements As Well As Cleaning Of The Worked Areas, - Project-Related Inventory And Execution Documentation Including The Required Product And Performance Evidence, - Personal User Instruction In The Operation Of The Windows And Outside Air Outlets, - Separate Local Airtightness Testing Of The Window Connections In Accordance With Lv. The Le
|