|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - The Work Construction Of 11 Kv Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Edd Sadabad Hathras; Electrical System Or Installation; Na - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , 8.5/9 Mtr. Long Pcc Poles. , 11 Mtr. Long Pcc Poles. , 9/11 Mtr. S.T. Poles , Acsr Weasel Conductor , Acsr Dog Conductor , Earthing Complete , Stay Set Complete , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , 16/25/50/95/120 Sqmm. Ab Cable , Eye Hook , Suspension Clamp , Ms Angle , Top Channel , Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp) , Dropper Channel , Dead End Clamp , Distribution Box , Guarding Angle With Clamp , G.I Wire 6/8/10 Swg , 11 Kv Xlpe Cable , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , 250 Kva T/F, 400 Kva T/F , Errection Of Following Poles Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Poles 8.5/9/11 Mtr. , Pcc Poles 11 Mtr. , Stp 9.0/11 Mtr. , Fixing Of Following Material As Per Respo Manual , Teoff Channel , 33/11 Kv Pin Insulator With Pin , Disc Insulator With Disc Fitting , F Bracket , 11 Kv X-Arm , Eye Hook , Suspension Clamp , Ms Angle , Top Channel , Diff Type Clamps (Cross Arm/Holding/D.P./Stay Clamp/ Dist. Box Clamp) , Dropper Channel , Dead End Clamp , Distribution Box , Guarding Angle With Clamp , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Shifting Of Distribution T/Fs From Site To Another Site And Safe Installation Of Following New/Repaired Cousted T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making All Ht/Lt Connection. , 10 Kva Tf, 16 Kva Tf, 25 Kva T/F, 63 Kva T/F, 100 Kva T/F , Installation And Shifting Of 250 Kva T/F, 400 Kva T/F. , Laying, Sagging And Stringing And Jumpering / Binding Etc. Of New & Old Acsr Weasal Conductor / Gi In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasal Conductor , Acsr Dog Conductor , 16/25/50/95/120 Sqmm. Ab Cable , Xlpe Cable , Providing & Fixing Of Following Material , Nut,Bolt & Washer , Cable Jointing Kit , Cutting, Chopping, Triming Of Tree Branches To Clear The Line Route To Give 2 Mtr. Horizontal And Vertical Clearance To The Line Coming In The Route Of Different Feeders As Per Direction Of Supervising Engineer , Guarding/Reguarding Of 11 Kv Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. , Construction Of Plinth Of Size 5*5*4 Above Ground Level One Ft Below The 11 Ground Level Of 9 After Exavation Of 4 Earth Brick Ballast Shall Be Provided And Rammering Will Be Done Properly After Ballast Shall Be Provided And Rammering Will Be Done Properly After That A Retaining Wall 9Width By Fist Class Brick In Ratio 1:4 Of Cement & Sand Shall Bemade. The Earth Shall Be Filled Up To One Ft.Below The Top Of The Plinth After This Brick Ballast Shall Be Provided Upto 6From The Earth Level And Proper Rammering Shall Be Done One No. Jall Of 12 Mm Ms Tor Shall Be Fixed In The Hollow Of Plinth And One Ii. Thick Rcc In Ratio Of Cement Sand & Stone Ballast Shall Be Laid On The Top Of The Plinth. The 12 Mm Thick Plastering Shall Be Done All Round The Plinth In 1:4 Ratio Of Cement And Sand. , Net Fencing Shall Be 1150 1200 Mm Made Of 35X35 Mm Ms Angle Covered By Expended Netal 14 Swg Up To Full Height 1200 Mm Duly Steftened By Ms Flat By An 8 Swg Dia Bolt & Nut. , Chemical Earthing Of 400/250 Kva Medium Powertransformers , Installation Of Extra T On The Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc, Required For Proper Completion Of Work. The T Pole Shall Be Grouted With Cement, Sand And Brick Ballast/Stone Ballast In Ratio 1:4:8 Including The Cost Of Material. , Installation Of 11 Kv Tpmo , Dismentlling And Removal Of Existing Line From The Various Area. (Areal Bunch Conductor, Dog Conductor & Areal Weasel Conductor) , Dismentlling Of Pole Stp/Pcc , Back Cartage , Acsr Weasel Conductor Scrap , Iron Scrap
|