1. The Subject Of The Order Is Reconstruction Of Street Lighting At Ul. Dąbrowskiego And Ogrodowa In Polkowice On The Section From Ul. Ogrodowa To The Intersection With Ul. Wojska Polskiego And Polna, In The Design And Build Formula. Implementation As Part Of The Investment Task Entitled: Reconstruction Of The Lighting At Ul. Dąbrowskiego And Ogrodowa In Polkowice (900-90015-6050). The Subject Of The Order Are Design Works, Construction Works And Installation And Engineering Works, Including: A) Development Of Complete Design/Technical Documentation, B) Obtaining The Right To Carry Out Construction Works In The Field Of Reconstruction And Expansion Of Lighting Along Ul. Ogrodowa And Dąbrowskiego In Polkowice,C) Disassembly Of Lighting Lamps,D) Installation Of Complete Lighting Poles With Foundations, Booms And Fixtures,E) Earthworks, Laying Cables,F) Installation Works - Processing And Connecting Cables, Wires,G) Measurements And Checks,H) Preparatory And Accompanying Works,I) Finishing Works, Reconstruction Of The Surface, Including Plantings In Accordance With The Conditions Issued By The Road And Area Manager, J) Preparation And Submission To The Ordering Party Of Complete As-Built Documentation Along With An As-Built Surveying Inventory - In 2 Copies. Requirements And Guidelines Of The Ordering Party For Lighting Fixtures And Poles.1.Luminaires, In Addition To Standard Certificates And Declarations Of Conformity, Must Have Enec And Enec+ Certificates.2.The Manufacturer Should Enter The Data Of These Luminaires (Power, Distribution, Color Temperature, Number Of Leds, Etc.) Into The Power Supplies Of The Luminaires, Allowing Them To Be Automatically Loaded Into The Control System.1.Color Of Fixtures – Flush With The Color Of The Pole And Boom. 2. The Ordering Party Requires The Use Of Anodized Aluminum Or Powder-Coated Seamless Steel Poles (Graphite/Gray Color), Height In Accordance With The Design, Oval Tapered.3.All Installed And Built-In Devices, Materials And Products Must Meet The Requirements Specified In Applicable Regulations And Standards. Moreover, The Entire Subject Of The Order Must Be Performed In Accordance With Applicable Law, Standards (Including Standard 13201:2016) And In Accordance With Technical Knowledge And Construction Practice. 4. The Ordering Party Requires That The Constructed Lighting Be Incorporated Into The Control System Before The Final Acceptance Date. The Luminaires Must Be Equipped With Zd4i Standard Sockets And Controllers. If It Is Not Possible To Mount The Socket On The Luminaire, Pole Holders Should Be Installed. 5. The Description Of The System Functionality Is Included In The Supplement To The Ffu. 6. The Ordering Party Will Not Incur Any Costs Related To Configuration, Implementation And Operation In Connection With The Inclusion Of New Luminaires In The Control System (Including Costs Related To The Use Of The Interface, Licenses, Server Fees, Etc.) During The Warranty Period - In Accordance With The Su
|