The Subject Of The Order Is The Performance Of Comprehensive Thermal Modernization Works Indicated In The Energy Audit And The Attached Documentation:1. Comprehensive Modernization Of The Central Heating Installation - Replacing Gas Boilers With New Ones, Adding Air/Air Heat Pumps As A Peak Source, Replacing Cables And Insulating Them, Installing A Bms System And A Heat Meter. Connection To The Pv Installation.2. Construction Of A Comprehensive Photovoltaic Installation.3. Replacement Of Lighting With Leds Along With The Replacement Of Cables And Electrical Switchboards.4. Insulation Of The Ceiling Above The Top Floor.5. Replacement Of Windows With Air Vents.6. Replacing External Doors.7. Replacing The Entrance Door (Meeting Accessibility Requirements For Disabled People).8. Insulation Of The External Wall.9. Modernization Of The Dhw Installation - Construction Of A Distribution Installation From The Gas Boiler Room, Connection To Gas Boilers (Central Heating), Installation Of An Energy-Saving Dhw Tank.10. Solutions Enabling The Achievement Of The Objectives Of The European Green Deal: - Management Of Rainwater (Purchase Of A Tank Allowing Its Collection And Use To Irrigate The Vegetation Surrounding The Building), Increasing Biologically Active Areas (Removing Part Of The Bituminous Surface And Creating A Lawn And Flower Beds With Perennials, Creating A Green Wall In The Building Of The Szerzyny Commune Office), - Supporting Biodiversity (Installation Of Birdbaths To Support Their Presence In Surroundings Of The Building).The Existing Window And Door Joinery In The Building Should Be Dismantled Without Damage And Placed In The Place Indicated By The Ordering Party. The Contractor Will Manage The Remaining Construction Waste On Its Own. The Work Should Be Carried Out In Such A Way As To Ensure The Functioning Of The Office, In Particular To Ensure Cleanliness After The Completion Of Work On A Given Day. Work Related To The Use Of Machines Generating Excessive Noise Should Be Performed On Saturdays Or In The Afternoon. The Ordering Party Sets Up To Four Partial Payments (All Payable In 2027), In Accordance With The Material And Financial Schedule To Be Prepared By The Contractor Selected In The Procedure In Consultation With The Ordering Party.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120252282
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.