The Subject Of The Order Is The Reconstruction Of A Road In Kuczewola. Common Procurement Dictionary: 45233140-2 - Road Works. The Scope Of The Task Includes: A) Preparatory Works, B) Earthworks, C) Substructure, D) Surface, E) Roadsides, F) Culvert Protection, G) Surveying. A Detailed Description Of The Subject Of The Order Is Included In: Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And Bill Of Quantities. Note: The Bill Of Quantities Attached To The Swz Is Of An Auxiliary Nature. Due To The Lump-Sum Nature Of The Contractual Remuneration, The Offer Price Should Take Into Account The Actual Costs Of Task Implementation Resulting From The Design Documentation, Stwiorb And Swz Provisions. As Part Of The Subject Of The Order, The Contractor Is Obliged To Provide Surveying Services, Restore The Area To Its Previous Condition, Perform All Tests, Tests And Checks. The Contractor, At His Own Expense, Must Prepare The Following Documents: As-Built Surveying Inventory And As-Built Documentation. If The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Or Standards, Approvals, Specifications And Systems Referred To In Art. 101 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described, And Such References Are Accompanied By The Words Or Equivalent. The Technical And Qualitative Features Of The Subject Of The Order Should Comply With Polish Standards Transposing European Standards Or Standards Of Other Member States Of The European Economic Area. A Contractor Who Refers To Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate (Prove) In The Offer That The Construction Works Or Devices Offered By Him Meet The Requirements Specified By The Ordering Party. If Equivalent Materials Are Used, The Ordering Party Requires The Contractor To Submit A List Of Replacement Materials For The Technical Documentation With The Offer (Own Study Containing At Least: Manufacturers Catalog, Manufacturers Name, Description Of Materials) - Failure To Submit Such A List Means That The Contractor Will Use The Materials And Solutions Adopted In Technical Documentation. The Ordering Party Requires A Guarantee For The Completed Subject Of The Order For A Period Of: Minimum 36 Months - Maximum 60 Months From The Date Of Acceptance Of The Construction Works By The Ordering Party And Signing (Without Comments) Of The Final Acceptance Protocol. Statutory Warranty Period. The Ordering Party Does Not Divide The Order Into Parts And Therefore Does Not Allow The Submission Of Partial Offers. Offers That Do Not Include The Full Scope Of The Subject Of The Order Will Be Rejected. Reasons For Not Dividing The Order Into Parts: The Need To Coordinate The Activities Of Various Contractors Implementing Individual Parts Of The Order Could Result In A Serious Risk Of Incorrect Implementation Of The Task. The Order May Be Completed By One Contractor In Its Enti
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120206769
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.