|
2. The Subject Of The Order Includes The Execution Of Construction Works Consisting In The Modernization Of The Locker Rooms And Social Facilities At The Municipal Stadium In Paczków. The Scope Of The Order Includes In Particular: 1) Performance Of The Necessary Demolition And Dismantling Works, Including The Demolition Of Partition Walls, Disassembly Of Existing Elements Of Equipment, Installations, Window And Door Joinery, Cladding, Ceilings And Other Elements Interfering With The Designed Scope Of Works; 2) Construction Of Water Supply And Sanitary Sewage Systems, Including Pipes, Risers And Approaches To The Designed Sanitary Facilities; 3) Execution Of Hot Water Installation Using An Existing Source Of Preparation Domestic Hot Water; 4) Construction Of A Central Heating Installation, Including A Radiator Installation And Underfloor Heating With Manifolds And Necessary Accessories Using An Existing Heat Source; 5) Construction And Adaptation Of A Ventilation Installation, Including Installation Of Ventilation Ducts, Insulation And Accessories, Installation Of A Water Heater Using An Existing Supply And Exhaust Air Handling Unit; 6) Implementation Of Electrical Installations, Including Power Supply, Lighting And Other Installations Provided For In The Design Documentation;7) Implementation Of Telecommunications Installations, Including Structured Cabling, Distribution Point, Network Switches And Necessary Equipment;8) Implementation Of A Cctv Monitoring Installation, Including Cabling, Internal And External Cameras, Recorder, Hard Drive And Other System Elements Provided For In The Documentation;9) Implementation Of An Intruder And Intruder Alarm System, Including Cabling, System Control Panel, Manipulators, Motion Detectors And Other System Elements Provided For In The Documentation;10) Execution Of Necessary Cable Routes, Installation Passages Through Building Partitions Along With Their Protection And Other Works Related To The Implementation Of Installations Provided For In The Design Documentation;11) Execution Of Designed Wall Finishes, Including Preparation Of Substrates, Plastering, Priming, Painting And Installation Of Designed Wall Coverings;12) Execution Of Designed Floors And Floor Coverings, Including Floors Made Of Stoneware Tiles And Other Materials Indicated In The Design Documentation; 13) Execution Of Suspended Ceilings Along With The Structure, Filling, Finishing Elements And Integration With The Designed Lighting And Installations; 14) Execution Of Finishing Works In The Rooms; 15) Execution Of Designed Structures And Carpentry Elements, Including Players Lockers, Showcases And Other Elements Of Permanent Equipment; 16) Execution Of Interior Design Elements, Including Mirrors, Decorative Elements, Graphics, Display Elements And Other Elements Provided For In The Documentation Design;17) Delivery And Assembly Of Room Equipment Provided For In The Design Documentation;18) Performance Of All Other Construction, Installation, F
|