|
The Subject Of The Order Is The Task Titled: Art Salon And Creative Atelier In The Cultural Center In Tuchów - Renovation Of The Rooms. Part 1: Construction And Finishing Works Of Rooms. As Part Of The Planned Project, The Scope Of Reconstruction And Modernization Includes, Among Others: 1.Dismantling The Existing Internal Entrance Doors To The Rooms, 2.Dismantling The Suspended Ceiling,3.Dismantling Radiators For Painting And Reassembling Them,4.Dismantling - Demolition Of Ceramic Tiles On The Stairs Leading To The First Floor Of The Building,5.Demolition Of Internal Floors In The Art Salon (In Part) And The Creative Salon, 6.Reconstruction Of Part Of The Stairs In Order To Adapt The Second Part Of The Facility To The Needs Of Disabled People, Construction Of A Ramp For Disabled People According To The Existing Driveway Located In The Art Salon, Implementation Based On The Attached Technical Drawings Of The Construction And Technical Design Developed In October 2021 (A Detailed Description Of The Subject Of The Order For This Scope Is Included In Annex No. 6 To The Swz), 7. Demolition And Disassembly Of Parts Of The Internal Walls Of The Art Salon, 8.Wiping The Existing Internal Plasters Together With Scraping The Paint Of The Renovated Rooms Covered By The Project And In The Gallery Corridor And Staircase,9.Plastering Works Related To The Replacement Of Internal Doors, 10. Flooring Works In The Creative Salon, Cloakroom And Lobby, 11. Covering The Gallery Corridor And Internal Stairs To The First Floor Of The Building With Granite Slabs, 12.Cladding Works Of Internal Walls And Ceilings According To The Interior Design Design,13.Installation Of Partition Walls And Suspended Ceilings Made Of Plasterboards In The Arranged Rooms Of The Exhibition Hall, Artistic And Creative Salon And In The Cloakroom Behind The Scenes,14.Painting Works Of Walls And Ceilings: Exhibition Hall, Gallery Corridor, Staircase, Cloakroom, Lobby And Creative And Artistic Salons, 15.Installation Of Mirrors On The Poles Of The Exhibition Hall,16.Reinstallation Of Painted Radiators Of The Central Heating System,17.Installation Of Internal Door Joinery, 18.Installation Of Black Industrial Aluminum Doors For Rooms 1.31,19.Installation Of Reinforced Hdf Entrance Doors For The Rooms Covered By The Interior Design Project,20.Replacement Of Internal Wall Finishing Covers With Granite Covers,21.Installation Of A Balustrade At The Constructed Driveway (Ramp) For Disabled People,22.Internal Finishing Works Of The Exhibition Hall, Artistic And Creative Salon, In The Cloakroom, Lobby, As Well As In The Gallery Corridor And In The Staircase,23.Installation Of A Stretch Ceiling, 24. Disassembly Of Ceiling Lighting And Electrical Equipment, 25. Modernization And Expansion Of The Internal Electrical And Telecommunications Installations (Low Current) In The Modernized Rooms Covered By The Interior Design Project And Electrical Installation Design, 26. Installation Of Lighting And Illumination
|