|
Road-Repair Works – Design Services, Technical Assistance And Execution Of Works Within The Investment Objective Rehabilitation Of Streets In Baia Mare Municipality, As A Result Of The Regional Water And Wastewater Infrastructure Development Project – Ferneziu District, Grivița District, Old Town.. As A Result Of The Large-Scale Works Carried Out By The Regional Water And Wastewater Infrastructure Development Project (Implemented By S.C. Vital S.A.), The Body Of Streets In The Ferneziu Neighborhoods (Colonia Topitorilor, Barajului, Lunci, Limpedea), Grivița (Privighetorii, Dealul Crucii, Victoriei - Pod Industriei - Unic), Old Town (Culturii, Gh. Șincai, Vasile Lucaciu, Simion) Bărnutiu, Horea), Has Suffered Deep Structural Degradation (Trenches, Subsidence, Destruction Of Bituminous Coatings), So That, Leaving The Arteries In Their Current State, Would Endanger Traffic Safety, Canceling Urban Comfort. Given The Aforementioned, It Is Necessary To Conclude A Contract In Order To Purchase Design Services, Technical Assistance And Execution Of Works, In Order To Develop And Modernize The Urban Mobility Infrastructure, An Investment To Ensure The Increase Of Safety And Accessibility Of The Transport Infrastructure, The Flow Of Traffic, The Promotion Of Sustainable Mobility, The Reduction Of The Impact On The Environment And The Improvement Of The Quality Of Life Of The Inhabitants. The Integrated Design And Execution Contract Will Ensure, Not Only The Restoration Of The Asphalt Carpet, But Also The Reconfiguration Of The Urban Public Space, Ensuring The Design And Execution Of Modern Sidewalks, Facilities For Non-Motorized Modes Of Transport And Road Safety Elements, Directly Contributing To The Reduction Of Carbon Emissions. The Estimated Value Of The Investment Is: 33,173,682.10 Lei Without Vat, As Follows: Project Verification: 7,248.87 Lei Without Vat; Technical Project: 362,443.63 Lei Without Vat Technical Assistance: 120,814.54 Lei Without Vat Construction And Installations: 32,535,499.54 Lei Without Vat Site Organization: 141,008.84 Lei Without Vat Related Expenses: 6,666.68 Lei Without Vat.
|