Industrial Machinery – Modernization Of The Sorting Plant – Delivery And Installation Of A New Ballistic Separator. 1. The Subject Of The Order Is The Delivery And Installation Of An Additional Ballistic Separator With A Multi-Panel Structure (At Least 8 Panels) In The Ordering Partys Existing Sorting Line Without Removing The Currently Used Separator From The Technological Line. Integration With The Currently Operating Line With The Possibility Of Switching Operation Between The New And Currently Used Ballistic Separator (Including The Construction Of The Necessary Belt Conveyors). Replacement Of The Ggf 280 Rising Belt Conveyor (Item H301), Which Supplies Material To The Ballistic Separator. Place Of Order Fulfillment: Ordering Partys Registered Office: Witaszyczki, Ul. Them. Mariusz Małynicza 1, 63-200 Jarocin. More Information And Requirements Are Included In The Annex To This Swz - Detailed Description Of The Subject Of The Order. 10. Documents Submitted To Confirm The Lack Of Grounds For Exclusion Referred To In Chapter Viii Section 4 And 5 Swz: 1) The Ordering Party Will Call On The Contractor Whose Offer Was Assessed The Highest To Submit A Declaration By The Contractor Regarding The Grounds For Exclusion Under Art. 5K Of Regulation 833/2014 And Art. 7 Section 1 Of The Act On Special Solutions For Counteracting Support For Aggression Against Ukraine And For The Protection Of National Security - Annex No. 9. 2) If The Contractor Relies On The Resources Of Other Entities, The Ordering Party Will Call On The Contractor Whose Offer Was Rated The Highest To Submit A Declaration Of The Entity Providing The Resources Regarding The Grounds For Exclusion Under Art. 5K Of Regulation 833/2014 And Art. 7 Section 1 Of The Act On Special Solutions For Counteracting Support For Aggression Against Ukraine And For The Protection Of National Security - Annex No. 10. 11. Certification: 11.1 The Contractor May, Instead Of Appropriate Subjective Evidence Required To Confirm The Lack Of Grounds For Exclusion, Submit A Public Procurement Contractors Certificate Referred To In Art. 124 Section 2 Of The Public Procurement Law, Confirming The Granting Of Certification Regarding Non-Exclusion. 11.2 In The Case Of Using The Certificate Referred To In Point 11.1, The Contractor Indicates In The Edz That He Will Use The Certificate, And Provides The Number And Designation Of The Certificate, The Name Of The Certifying Entity, The Validity Period Of The Certification And The Extent To Which The Certificate Is To Confirm The Lack Of Grounds For Exclusion. 11.3 The Certificate Replaces Appropriate Subjective Means Of Evidence Only To The Extent That Its Content Confirms The Lack Of Grounds For Exclusion Specified In This Swz. If The Certificate Covers Only Part Of The Exclusion Grounds, The Contractor Is Obliged To Demonstrate The Remaining Scope In Accordance With The Requirements Specified In The Swz. 11.4 If The Jedz Statement Shows That The Contractor Will Use The Certificate And The Contractor Has Provided Data Enabling Its Independent Download, The Ordering Party Will Independently Verify The Certificate In The Certification Database And Will Not Call On The Contractor To Submit Subjective Measures.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119897254
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.