Architectural, Engineering And Planning Services – Pécs - Kozármisleny Bicycle Path Construction. Eng. Planning. The Task Of The Winning At Is The Accepted Ii. Preparation Of Licensed Plans Based On The Route Concept Plan Quantity Affected By Planning: 3895 M Tasks Of The Winning At: • The 1. No. Carry Out All Surveys And Geodetic Measurements Required For Planning Within The Action Area Indicated On The Map Cutout. • In Addition To The Review Of The Existing Road Network And Pedestrian Traffic Facilities Of The Investment Campaign Area, It Is Necessary To Prepare Complete Road Bicycle Path Construction And Traffic Engineering Plans. Within The Designated Action Area, Safe (And Barrier-Free) Use Must Be Ensured For All Road Users. Part Of This Is The Review Of Existing Street Lighting And The Provision Of Standard Street Lighting. • A Plan For The Complete Development Of A Junction With Traffic Lights On The Route Indicated By The Tenderer Must Be Drawn Up, And After The Mapping Of The Entire Utility Network, Adequate, Sized Rainwater Drainage Must Be Ensured After The Review Of The Existing System. The Winning At Must Prepare And Deliver A Design Documentation That Fully Complies With The Laws, Standards And Road Technical Regulations In Force, Or Deviations From This Can Be Justified By Exemption. Documentation Must Be Prepared That Can Be Granted A Building Permit And Can Be Physically Implemented According To The Plan - At The Expense Of The Available Funds. During Planning, The Tasks Of The Winning Ta Are: • It Has The Obligation Of Continuous Consultation And Data Provision With The Tenderer. • Acknowledging, Mapping And Documenting The Existing State Is The Task And Responsibility Of The Winning Ta. This Includes The Condition And Quality Of The Existing Utility Manholes And Covers, As Well As The Quantity And Condition Assessment Of The Existing Mobiles And Plant Stock. • Part Of The Licensing Plans Is The Preparation Of Survey Plans Covering All Disciplines. • The Task And Responsibility Of The Winning At During The Planning Process Is To Survey All Existing/Remaining Relevant Pavements, Substructures And Structures In Terms Of The Implementation Of The Investment. All Costs Incurred For This Must Be Covered By The Winning At. • It Is The Task And Responsibility Of The Winning Ta To Initiate The Consultation Necessary To Resolve All Relevant Issues Arising During The Design With The Bidder, The Relevant Managers And Authorities. The Task Of The Winning At Is To Document These Negotiations In The Form Of Signed Reminders And Attendance Sheets. • During The Design, The Winning At Must Propose Technical Solutions That Can Be Operated In The Long Term Under Favorable Conditions. The Tenderer Is Looking For Proposals For The Use Of Sustainable Technical Solutions And Renewable Energy Sources. • The Task Of The Winning Ta Is To Prepare A Cost Estimate According To The Types Of Work Prior To The Start Of The Licensing Procedure, • The Task And Responsibility Of The Winning Ta Is To
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119852112
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.