Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Future Of Transpo ... in Switzerland
Tender Notice
TenderID
119809186
Tender Brief
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Future Of Transport In The Thun Region, Work Package 3: Urban, Traffic, Structural And Environmental Planning Feasibility Study Of Two Tunnel Variants
Architectural, Construction, Engineering And Inspection Services - Future Of Transport In The Thun Region, Work Package 3: Urban, Traffic, Structural And Environmental Planning Feasibility Study Of Two Tunnel Variants. Work Package 3: In-Depth Urban Development Or Urban, Settlement, Traffic, Structural Engineering And Environmental Planning Feasibility Study For The Two Tunnel Solutions “Hübelitunnel” And “Aarecrossing South” (General Planner) The “Traffic Future Region Thun” Project Builds On The Thun City Center Traffic Study – Right Side Of The Lake, Which Was Developed On Behalf Of The Thun Development Area By The End Of 2023. Three Variants Were Examined To Improve The Traffic Situation In The Long Term: The Hübeli Tunnel, The Aare South Crossing And An Overall Traffic Variant With Traffic Controls And Expansions For Public Transport And Bicycle Traffic. All Variants Are Fundamentally Considered Feasible; However, The Overall Transport Variant Was Rated As The Most Cost-Effective And Effective Solution. In The Event That This Is Not Sufficient, The Two Tunnel Variants Should Be Examined In More Detail. In Discussions About Possible Co-Financing, The Federal Government Emphasized That A Tunnel Project Should Not Be Viewed In Isolation, But Rather Must Be Embedded In A Convincing Overall Concept. The Key Issues Are The Coordination Of Settlement And Transport Development, The Impact On Urban Development And Jobs, The Integration Into The Overall Transport System And Accompanying Measures. The Benefits Of The Variants Must Be Presented In A Comprehensible Manner Based On The Criteria Of The Agglomeration Programs. In Addition, A Clearly Justified Variant Decision Is Required That Shows That Other Options Have Been Exhausted And The Chosen Solution Is Widely Accepted. The Region Is Following This Recommendation And Deepening The Two Variants, Hübeli Tunnel And Aare Crossing South, In Parallel. The Aim Is A Politically Consolidated Decision By The End Of 2028 As Well As The Technical Integration Into The 6Th Generation Thun Agglomeration Program. The Concerns Of The Population, Politics And Administration Of The Affected Communities Should Be Taken Into Account And The Variants Should Be Evaluated Based On Transparent Qualitative And Quantitative Criteria. Alternative Relief Options Are Not The Subject Of The Project; However, The Existing Tunnel Variants Can Be Optimized Or Excluded In The Event Of Serious No-Gos. In Addition To The Technical Assessment, The Project Is Intended To Enable A Public Discourse About The Opportunities, Risks, Benefits And Costs Of A Tunnel Solution. This Is Not About A General Tunnel Yes-Or-No Debate, But Rather A Differentiated Examination Of Traffic, Urban Development, Financial And Social Effects. The Client Is The Thun Development Area (Ert). The Strategic Leadership Of The Project Is Provided By The “Future Of Transport” Committee. It Decides On Interim Results, Awards And Specifications. The Operational Project Management Leads The Project. In Addition, Political, Technical And Public Support Bodies Are Involved. The Political Support Reflects Interim Statuses From A Political Perspective, The Technical Support Ensures Coordination
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119809186
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.