|
Construction Work – Construction Investment Of The New Transport Museum. Complete General Construction Of The Project Elements Of The New Transport Museum As Follows: 1. Main Building: Main Building, Diesel Hall, New Hall - Basic Task 2. Törekvés Cultural House - No. 1 Optional Task 3. Construction Of Small Buildings (Small Campus) - No. 2 Optional Task The Development Will Take Place In An Area With A Floor Area Of 78,383 M², Of Which 31,060 M² Will Be Built On. The Total Net Useful Floor Area Of The Planned Buildings Is 63,814 M², The Main Part Of Which, 58,395 M², Is Made Up Of The Main Building - The Connected Dizelcsarnok, The New Hall And The Complexly Renovated Main Building. The Remaining Floor Space Is Made Up Of The Törekvés Building (3,581 M²) And, According To The Building Permit, The Small Campus Or Small Buildings Buildings, (Together 2,796 M²) The Cafe 34, The Community Workshop Building 51, The Cold War Shelter 90 And The Building 94. The Functional Design Of The Main Building Is Based On A Balance Between The Basic Tasks Of The Museum And The Needs Of The Public. The Permanent Exhibition, Which Presents Large, Object-Like Artefacts, Occupies An Area Of Approximately 12,200 M², The Temporary Exhibitions 1,400 M², And The Event Spaces 5,400 M². The Collections Are Housed In A 6,800 M² Art Warehouse And 3,450 M² Library And Archive Storage Space, While The Restoration Workshops Operate On 2,200 M² And The Offices On 3,000 M². The Service, Mechanical And Technical Areas Required For Operation Occupy 9,750 M², And The Pedestrian And Parking Functions Occupy 12,400 M². The Primary Goal Of The Landscape Architecture Concept Is To Create A Family-Friendly, Experience-Based Museum Park. As Part Of This, Open-Air Exhibitions, A Transport-Themed Playground, A Museum-Pedagogical Garden With A Small Motorcycle Track, A Garden Railway, Picnic Areas, A Cafe With Garden Space, And A Water Surface Suitable For Small Boats Will Be Created. During The Development, A Total Of 13,000 M² Of Green Space Will Be Created, Which Will Complement The Cultural Functions With A High-Quality Recreational Environment. The Projects Sustainability Concept Aims To Achieve Leed Gold Certification, Which Ensures A High Level Of Energy Efficiency, Environmental Performance And Sustainable Operation. The Development Is Based On The Complex Rehabilitation Of A Railway Brownfield Area, Where The Discovered, Typically Local Hydrocarbon Pollution Is Treated With Targeted, Local Interventions; The Degree Of Contamination Is Significant, But It Can Be Considered Average In An Area With Such An Industrial History, So There Is No Need For Uniform Soil Replacement Of The Entire Area. Remediation Is Carried Out At Seven Separate Points, And The Condition Of The Groundwater Is Accompanied By Regular Monitoring. Before The Investment, A Detailed Asbestos Survey Was Prepared, On The Basis Of Which Complete Asbestos Removal Will Be Carried Out During The Construction. Following The Principles Of The Circular Economy, The Plan Also Includes The Possible Recycling Of Demolished Construction Materials, Such As Pavements And Street Furniture, During The Construction Of The Garden. In Accordance With Leed Gold Certification During The Entire Construction
|