|
1. The Subject Of The Order Is The Renovation Of Classrooms In The Building Of The Forest Technical Secondary School. Prof. Jan Miklaszewski In Starościn - School Building, 1St Floor, Rooms No. 2/1–2/5 On The Plot No. 633/14 In Starościn.2.The Scope Of The Order Includes In Particular: 1) Demolition And Disassembly Works In The Renovated Classrooms And Back Rooms, Including Removal Of Existing Carpets And Floor Panels, Dismantling Of Joinery And Indicated Elements Of Installations And Equipment, 2) Separation Of A Utility Room From The Back Of The Physics Office, Including The Construction Of A Partition Wall, A New Entrance From The Corridor, Installation Of A Lintel And The Execution Of The Necessary Brickwork And Reconstruction Works, 3) Preparation And Repair Of Wall And Ceiling Surfaces, Including Removal Of Old Paint Coatings And Paneling, Filling Of Defects, Plastering In Places Requiring Restoration, Priming And Applying Gypsum Plasters, 4) Painting Walls And Ceilings Of Renovated Rooms, 5) Preparation, Repair And Leveling Of Floor Surfaces And Construction Of Floors From Commercial Pvc Floor Coverings Along With Joints, Plinths And Finishing Of Floor Joints, 6) Replacement Of Internal Door Joinery Together With Door Frames, Fittings And The Required Equipment As Well As The Processing Of Jambs,7) Replacement Of Internal Window Joinery Between The Renovated Rooms And The Corridor Along With The Processing Of Jambs,8) Performance Of Sanitary Works In The Back Rooms, Including Replacement Of Washbasins, Faucets, Siphons, Valves And Installation Approaches, As Well As Construction Of The Planned Installation Casing Made Of Plasterboards And Local Cladding With Ceramic Tiles At Washbasins,9) Renovation Of The Existing Steel Ventilation Grilles, Replacement Of The Indicated Grilles And Painting Of Central Heating Pipes And Other Installation Elements Provided For In The Design Documentation,10) Reconstruction Of Electrical Installations, Including Reconstruction Of The First Floor Switchgear, Replacement Of Lines Supplying The Ground Floor And First Floor Switchboards And Execution Of Wiring Installation, Installation Of Plug Sockets, Connectors And Required Protections,11) Construction Of Basic, Emergency And Evacuation Lighting Along With The Installation Of Fixtures And Power Supply Installation,12) Construction Of Cabling And Connection Points For Connecting Multimedia Devices And Arranging And Hiding The Cables Of Telecommunications And It Installations To The Extent Specified In The Design Documentation,13) Carrying Out The Required Tests, Examinations And Measurements Of The Completed Installations And Preparing Protocols And As-Built Documentation,14) Securing The Work Area And Existing Equipment, Carrying Out The Work Taking Into Account The Functioning Of The Active Educational Facility, Removing And Managing Waste Generated During The Execution Of The Order And Tidying Up The Work Sites,15) Providing The Ordering Party With As-Built
|